Running at their respective constant rates, Machine X takes 2 days longer to produce w widgets than Machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

a) 4
b) 6
c) 8
d) 10
e) 12

answer e
Join the discussion
Source: — Problem Solving |

by neelgandham » Mon Dec 19, 2011 8:22 am
Hi Joconnor,

This is already answered here https://www.beatthegmat.com/how-many-day ... 11577.html.