Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

GMAT Prep Work Rates Question

Expert replies
by CMP.1 » Tue Apr 24, 2012 12:01 pm
Could I kindly ask whether someone could explain the method to solving this particular type of rates question for me please?

I am looking to take the GMAT (3rd Attempt) one last time before the new IR section is introduced on June the 5th.....last shot, praying I get it right this time!



Question: Six machines, each working at the same constant rate, can complete a job in 12 Days. How many additional machines, each working at the same constant rate, would be required to complete the task in 8 Days?


Many thanks for all your help,


Chris
Join the discussion
Source: — Problem Solving |

by gschaefer » Tue Apr 24, 2012 12:43 pm
here is one way to get to the solution:

you know that 6 machine can complete the job in 12 days.
This means that 1 machine can do the job in 72 Days since all machines work at the same constant rate.
In order to find the number of machine which are needed to do the job in 8 days you have to divide 72 days by 8 days and get 9 machine

9-6 = 3 so 3 new machines are required to complete the job.

I hope this explanation helps you
Join the discussion

by neelgandham » Tue Apr 24, 2012 12:45 pm
6 machines can complete a job in 12 days. So,
1 machine can complete the same job in 12*6 days
x machines can complete the same job in 12*6/x days

Total number of days = 12*6/x = 8 days(From the question stem)
So 12*6/8 = x
x = 9.
9 machines can complete the same job in 12*6/9(=8)days. So, we need 3 additional machines to complete the task in 8 Days.

But the best way is to remember that Machine(Person) days = Constant (For same units of work).
i.e. # of persons or machines * # of days = Constant.(For same units of work)
Case 1: # of persons or machines * # of days = 6 * 12
Case 2: # of persons or machines * # of days = x * 8
Since, # of persons or machines * # of days = Constant, 6 * 12 = x * 8. So the value of x = 9

and yes, don't worry about your exam. I am sure you are going to crack the 680 mark this time round. Good luck with your preparation.
Anil Gandham
Welcome to BEATtheGMAT | Photography | Getting Started | BTG Community rules | MBA Watch
Check out GMAT Prep Now’s online course at https://www.gmatprepnow.com/
Join the discussion

by CMP.1 » Tue Apr 24, 2012 1:12 pm
Thank you both very much for such prompt and well explained replies, I am most grateful! The silly thing is I actually managed to get to the "9" part, but couldnt work out where to go from there, or see the logic as to where the answer lay from that point in.

Thankfully thats another question issue ive managed to crack thanks to your help so fingers crossed for the rest.


Chris
Join the discussion

by [email protected] » Wed Apr 25, 2012 2:40 am
You have to use the Man Days formula that we learn in the time and work chapter.

It says that M1 X D1 = M2 X D2

If 12 men were required to do a job in 10 days, how many days will 15 men take...


Apply the above formula here and you get the answer as 9 overall and 3 additional machines.

Show spirit and move ahead. Do not get disheartened. Everybody is sailing in the same ship of GMAT on this site named BTG...

Don't give up Come what may and you will see yourself scoring a 700+...

Hope my post would have helped you Dude...
IT IS TIME TO BEAT THE GMAT

LEARNING, APPLICATION AND TIMING IS THE FACT OF GMAT AND LIFE AS WELL... KEEP PLAYING!!!

Whenever you feel that my post really helped you to learn something new, please press on the 'THANK' button.
Join the discussion

by ronnie1985 » Wed Apr 25, 2012 9:56 am
Dear CMP,
Please note that speeds can be arithmetically added to each other, so you can exploit the concept to solve the problems on work and speed.

Here, Rate of six machines working together = 1/12 day^-1. therefore speed of each machine = 1/(6*12) day^-1
Now required speed = 1/8 day^-1. Hence number of machines required = (1/8) / (1/72) = 9
So extra machines = 9-6 = 3
Follow your passion, Success as perceived by others shall follow you