BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Working together at their respective constant rates, Machine

Expert replies
by BTGmoderatorDC » Mon Jul 15, 2019 9:52 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Working together at their respective constant rates, Machine A and Machine B can produce 1,200 units in 8 hours. Working alone, Machine B would complete that same output in 50% more time. If Machine A were to work on its own for an 8-hour shift, what percent of the 1,200 unit total would it produce?

A. 25
B. 33
C. 50
D. 67
E. 75

OA B

Source: Veritas Prep
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Tue Jul 16, 2019 4:37 am
The prompt should read as follows:
BTGmoderatorDC wrote:Working together at their respective constant rates, Machine A and Machine B can produce 1,200 units in 8 hours. Working alone, Machine B would complete that same output in 50% more time. If Machine A were to work on its own for an 8-hour shift, APPROXIMATELY what percent of the 1,200 unit total would it produce?

A. 25
B. 33
C. 50
D. 67
E. 75
Since A+B take 8 hours to produce 1200 units, the combined rate for A+B = w/t = 1200/8 = 150 units per hour.

Since B take 50% more time than the 8 hours required when A+B work together, B's time = 8 + (50% of 8) = 8 + 4 = 12 hours.
Since B takes 12 hours to produce 1200 units, B's rate alone = w/t = 1200/12 = 100 units per hour.
Thus, A's rate alone = (combined rate for A+B) - (B's rate alone) = 150 - 100 = 50 units per hour.

The two rates in blue indicate the following:
Of the 150 units produced by A+B each hour, 50 units are produced by A, implying that (A's work)/(total work) = 50/150 = 1/3 ≈ 33.33%.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by swerve » Tue Jul 16, 2019 9:41 am
- Machine A and Machine B can produce 1,200 units in 8 hours \(\Rightarrow\) in 1 hour they can produce \(\frac{1200}{8} = 150\) units.

- Machine B would complete that same output in 50% more time \(\Rightarrow\) to produce 150 units, it takes B: 1,5 hours. \(\Rightarrow\) In 1 hour B can produce: \(150: 1,5 = 100\) units.

\(\Rightarrow\) In 1 hour A can produce: \(150 - 100 = 50\) units.
\(\Rightarrow\) If Machine A were to work on its own for an 8-hour shift, it can produce: \(50\cdot 8 = 400\) units \(= 33.33\)% of total 1200 units.

Hence the answer is __B__.
Join the discussion

by Scott@TargetTestPrep » Wed Jul 31, 2019 4:26 pm
BTGmoderatorDC wrote:Working together at their respective constant rates, Machine A and Machine B can produce 1,200 units in 8 hours. Working alone, Machine B would complete that same output in 50% more time. If Machine A were to work on its own for an 8-hour shift, what percent of the 1,200 unit total would it produce?

A. 25
B. 33
C. 50
D. 67
E. 75

OA B

Source: Veritas Prep
We can let x = the number of hours it takes machine A alone to produce 1,200 units. Notice that the rate of A is 1,200/x. Since machine B takes 1.5(8) = 12 hours alone to produce 1,200 units, the rate of B is 1,200/12 = 100. Their combined rate is therefore 1,200/x + 100. However, since they can produce 1,200 units in 8 hours when working together, their combined rate is also 1,200/8 = 150. Therefore, we can create the equation:

1,200/x + 100 = 150

1,200/x = 50

x = 1,200/50 = 24

Since it takes machine A 24 hours to produce 1,200 units, in 8 hours, it produces 8/24 = 1/3, or 33%, of the 1,200 units.

Answer: B