right wrong
Pick an answer to see how members did
Log this miss in the free GMAT error log
Get the error logGet one like this every day: the free 60-day plan
Start the planA. 25
B. 33
C. 50
D. 67
E. 75
OA B
Source: Veritas Prep
Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.
See classesLearn live with an expert or move at your own pace. Every option includes the complete TTP study system.
Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.
with Josh Braslow, 20+ years in test prep
Self-paced EA prep. Study on your schedule.
with
Complete access from day one. Study on your schedule.
right wrong
Pick an answer to see how members did
Log this miss in the free GMAT error log
Get the error logGet one like this every day: the free 60-day plan
Start the planSince A+B take 8 hours to produce 1200 units, the combined rate for A+B = w/t = 1200/8 = 150 units per hour.BTGmoderatorDC wrote:Working together at their respective constant rates, Machine A and Machine B can produce 1,200 units in 8 hours. Working alone, Machine B would complete that same output in 50% more time. If Machine A were to work on its own for an 8-hour shift, APPROXIMATELY what percent of the 1,200 unit total would it produce?
A. 25
B. 33
C. 50
D. 67
E. 75
We can let x = the number of hours it takes machine A alone to produce 1,200 units. Notice that the rate of A is 1,200/x. Since machine B takes 1.5(8) = 12 hours alone to produce 1,200 units, the rate of B is 1,200/12 = 100. Their combined rate is therefore 1,200/x + 100. However, since they can produce 1,200 units in 8 hours when working together, their combined rate is also 1,200/8 = 150. Therefore, we can create the equation:BTGmoderatorDC wrote:Working together at their respective constant rates, Machine A and Machine B can produce 1,200 units in 8 hours. Working alone, Machine B would complete that same output in 50% more time. If Machine A were to work on its own for an 8-hour shift, what percent of the 1,200 unit total would it produce?
A. 25
B. 33
C. 50
D. 67
E. 75
OA B
Source: Veritas Prep
