BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Working simultaneously at an identical constant rate,

Expert replies
by VJesus12 » Thu Nov 30, 2017 10:04 am
Working simultaneously at an identical constant rate, it takes 6 machines 8 hours to produce y widgets. How many machines, working at that identical constant rate, are necessary to produce 2y widgets in 4 hours?

A. 6
B. 12
C. 18
D. 24
E. 48

The OA is D .

I am confused here. Can any experts clarify this PS question to me?
Join the discussion
Source: — Problem Solving |

by [email protected] » Thu Nov 30, 2017 10:44 am
Hi VJesus12,

We're told that - working simultaneously at an identical constant rate - it takes 6 machines 8 hours to produce Y widgets. We're asked for the number of machines, working at that identical constant rate, are necessary to produce 2Y widgets in 4 hours.

With these types of Work questions, it helps to determine the total amount of work needed to complete a task.

(6 machines)(8 hours each) = 48 machine-hours of work to produce Y widgets.

The question asks us to create 2Y widgets, which is DOUBLE the number of widgets (above). Thus, it would take DOUBLE the work (re: 96 machine-hours of work). With just 4 hours to total time, we would need....

(X machines)(4 hours each) = 96 machine-hours of work to produce 2Y widgets.
X = 24 machines

Final Answer: D

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Jeff@TargetTestPrep » Tue Jan 02, 2018 11:04 am
VJesus12 wrote:Working simultaneously at an identical constant rate, it takes 6 machines 8 hours to produce y widgets. How many machines, working at that identical constant rate, are necessary to produce 2y widgets in 4 hours?

A. 6
B. 12
C. 18
D. 24
E. 48

We are given that the rate of 6 machines is y/8. Using a proportion, we can determine how many machines work at a rate of 2y/4 = y/2.

6/(y/8) = n/(y/2)

48/y = 2n/y

48y = 2ny

24 = n

Alternate solution:

We see that the number of widgets needed to be produced (2y) is twice the given number of widgets (y). Thus, we need to double 6 machines to 12 machines so that in 8 hours they can produce 2y widgets. However, we see we need to produce these 2y widgets in 4 hours, which is half of the given 8 hours. Thus, we need to double the machines again from 12 machines to 24 machines to produce 2y widgets in 4 hours.

Answer: D

Jeffrey Miller
Head of GMAT Instruction
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews
Join the discussion