right wrong
Pick an answer to see how members did
Log this miss in the free GMAT error log
Get the error logGet one like this every day: the free 60-day plan
Start the planA. 24
B. 18
C. 16
D. 12
E. 8
OA B
Source: GMAT Prep
Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.
See classesLearn live with an expert or move at your own pace. Every option includes the complete TTP study system.
Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.
with Josh Braslow, 20+ years in test prep
Self-paced EA prep. Study on your schedule.
with
Complete access from day one. Study on your schedule.
right wrong
Pick an answer to see how members did
Log this miss in the free GMAT error log
Get the error logGet one like this every day: the free 60-day plan
Start the planUse the following equation:BTGmoderatorDC wrote:Working simultaneously and independently at an identical constant rate, 4 machines of a certain type can produce a total of x units of product P in 6 days. How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?
A. 24
B. 18
C. 16
D. 12
E. 8
Let's assign a nice value to x (a value that will work well with all of the numbers 3, 4 and 6.BTGmoderatorDC wrote:Working simultaneously and independently at an identical constant rate, 4 machines of a certain type can produce a total of x units of product P in 6 days. How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?
A. 24
B. 18
C. 16
D. 12
E. 8
OA B
Source: GMAT Prep
We are given that 4 machines can complete x units in 6 days. Thus, the rate of the 4 machines is x/6.BTGmoderatorDC wrote:Working simultaneously and independently at an identical constant rate, 4 machines of a certain type can produce a total of x units of product P in 6 days. How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?