BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Working at their respective constant rates, Paul, Abdul, and

Expert replies
by AAPL » Fri Aug 09, 2019 7:40 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Veritas Prep

Working at their respective constant rates, Paul, Abdul, and Adam alone can finish a certain work in 3, 4, and 5 hours respectively. If all three work together to finish the work, what fraction of the work will be done by Adam?

A. 1/4
B. 12/47
C. 1/3
D. 5/12
E. 20/47

OA B
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Fri Aug 09, 2019 8:12 am
AAPL wrote:Veritas Prep

Working at their respective constant rates, Paul, Abdul, and Adam alone can finish a certain work in 3, 4, and 5 hours respectively. If all three work together to finish the work, what fraction of the work will be done by Adam?

A. 1/4
B. 12/47
C. 1/3
D. 5/12
E. 20/47

OA B
One approach is to assign a "nice" value to the entire job. That is, a value that works well with the given information (3, 4, and 5 hours).
The least common multiple of 3, 4 and 5 is 60.
So, let's say the ENTIRE job consists of making 60 widgets.

If Paul can complete the job (make 60 widgets) in 3 hours, then his RATE of work = 20 widgets PER HOUR
If Abdul can make 60 widgets in 4 hours, then his RATE of work = 15 widgets PER HOUR
If Adam can make 60 widgets in 5 hours, then his RATE of work = 12 widgets PER HOUR
So, if they work TOGETHER, their combined RATE = 20 + 15 + 12 = 47 widgets PER HOUR

So, for every HOUR that passes, the GROUP can make 47 widgets
We also know that, for every HOUR that passes, the Adam can made 12 widgets (since his RATE of work = 12 widgets PER HOUR)

This means that, when the 3 people work together, Adam makes 12/47 of the widgets

Answer: B

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by Scott@TargetTestPrep » Mon Aug 12, 2019 5:41 pm
AAPL wrote:Veritas Prep

Working at their respective constant rates, Paul, Abdul, and Adam alone can finish a certain work in 3, 4, and 5 hours respectively. If all three work together to finish the work, what fraction of the work will be done by Adam?

A. 1/4
B. 12/47
C. 1/3
D. 5/12
E. 20/47

OA B
The respective rates of Paul, Abdul, and Adam are 1/3, 1/4, and 1/5. We can let t = the time during which all three people work together; thus, their combined work is:

(1/3)t + (1/4)t + (1/5)t = (20/60)t + (15/60)t + (12/60)t = (47/60)t

Thus, the fraction of the job that Adam will complete is (1/5)t/(47/60)t = 60/(47 x 5) = 12/47.

Alternate Solution:

First, let's determine how much time it takes for the three of them to complete the job. Notice that in 1 hour, Paul, Abdul and Adam can do 1/3, 1/4 and 1/5 of the job, respectively. Thus, with all of them working together,

1/3 + 1/4 + 1/5 = 47/60

of the job gets done in one hour. If 47/60 of the job takes one hour to complete, then the whole job will take 60/47 hours to complete.

Next, we can set up a proportion to determine how much of the job gets done by Adam. Keeping in mind that Adam can do 1/5 of the job in one hour, we set up the proportion: "1/5 of the job is to 1 hour as x of the job is to 60/47 hours."

(1/5)/1 = x/(60/47)

x = (1/5)*(60/47) = 12/47

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion