Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Working at their individual same constant rate, 24 machines can complete a certain production job in 10 hours when they

Expert replies
by BTGmoderatorLU » Tue Mar 16, 2021 5:46 pm
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

Source: E-GMAT

Working at their individual same constant rate, 24 machines can complete a certain production job in 10 hours when they all work together. On a certain day, due to minor malfunction, 8 of those machines were no operating for the first 2 hours. Compared to normal days, what is the extra time taken to complete the production job on that day?

A. 20 minutes
B. 30 minutes
C. 40 minutes
D. 1 hour
E. 1 hour 20 minutes

The OA is C
Join the discussion
Source: — Problem Solving |

24 machines can complete a production job in 10 hours.
Given that all machines can work at the same constant rate, assuming each machine can complete 1 unit of the job per hour. Then, total job = 24 * 10 = 240 units
On a certain day, 8 machines did not work for the first 2 hours, so, only (24 - 8 = 16) machines were working.
Job done by 16 machines in 2 hours = 16 * 2 = 32 units
If all machines were working, the work done in 2 hours by 24 machines = 24 * 2 = 48 units
$$Extra\ time\ taken\ to\ complete\ the\ job=\frac{32}{40}-\frac{16}{24}=\frac{8}{12}$$
$$=\frac{4}{6}=\frac{2}{3}hours$$
If 1 hour = 60 minutes
$$Then,\frac{2}{3}hours=60\cdot\frac{2}{3}=\frac{120}{3}=40\ minutes$$

Answer = option C
Join the discussion

BTGmoderatorLU wrote: ↑
Tue Mar 16, 2021 5:46 pm
Source: E-GMAT

Working at their individual same constant rate, 24 machines can complete a certain production job in 10 hours when they all work together. On a certain day, due to minor malfunction, 8 of those machines were no operating for the first 2 hours. Compared to normal days, what is the extra time taken to complete the production job on that day?

A. 20 minutes
B. 30 minutes
C. 40 minutes
D. 1 hour
E. 1 hour 20 minutes

The OA is C
Solution:

The rate of 24 machines is 1/10.

On a certain day 16 machines first ran for 2 hours.

The rate of the 16 machines is:

16/n = 24/(1/10)

16/n = 240

16 = 240n

n = 16/240 = 1/15

Thus, when 16 machines work for 2 hours, the fraction of the job completed is 1/15 x 2 = 2/15.

Thus, 13/15 of the job needs to be completed by 24 machines. The time it will take to complete the job is:

(13/15)/(1/10) = 130/15 = 26/3 hours

Therefore, the total time spent on the job is 2 + 26/3 = 32/3 hours = 10 ⅔ hours = 10 hours 40 minutes, which is 40 minutes more than on a normal day.

Alternate Solution:

Since the 24 machines normally require 10 hours to get the job done, the total time required is 240 machine hours.

On the day of the malfunction, only 16 machines were working for the first 2 hours; thus, they accomplished 16 x 2 = 32 machine hours of production.

When all 24 machines were back in production, we see that there were 24 machines that needed to accomplish the remaining (240 - 32) = 208 machine hours of production. This results in 208/24 = 8 ⅔ additional hours.

Thus, on the day of the malfunction, the machines had to work for 2 + 8 ⅔ = 10 ⅔ hours, which is 40 minutes longer than normal.

Answer: C


Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion