6 men can do 3/5 of a job in 20 minutesPoisson wrote:Working at the same rate, 6 men can do 3/5 of a job in 20 minutes. At this rate, how many minutes would it take one man to do 1/4 of the job?
A. 30 minutes
B. 40 minutes
C. 50 minutes
D. 60 minutes
E. 70 minutes
So, 1 MAN can do 3/30 of a job in 20 minutes [divided 6 men by 6, and divided 3/5 by 6]
In other words, 1 MAN can do 1/10 of a job in 20 minutes
This means that, 1 MAN can do 2/10 of a job in 40 minutes
And 1 MAN can do 3/10 of a job in 60 minutes
Since 1/4 lies BETWEEN 2/20 and 3/10, we can conclude that it takes more than 40 minutes and less then 60 minutes to complete 1/4 of the job.
Answer: C
Cheers,
Brent















