Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

WORK & TIME

Expert replies
by neya » Tue Sep 13, 2011 9:42 pm
20 men can finish a piece of work in 30 days.When should 5 men leave the work so that it may be finished in 35 days?

a. 10 days
b. 20 days
c. 25days
d. 15 days
Join the discussion
Source: — Problem Solving |

by cans » Tue Sep 13, 2011 9:52 pm
20 men -> 30 days. 1 man 600 days and 15 men 40 days.
20 men can do 1/30 work in a day..
15 men can do 1/140 work in a day
a) 20 men work for 10 days: 1/3 work done. 15 men work for 25 days: 25/40 done. Nopes
b) 20 men work for 20 days: 2/3 work done. 15 men work for 15 days: 15/40 done. Nopes
c) 20 men work for 25 days: 5/6 work done. 15 men work for 10 days: 10/40 done. Nopes
d) 20 men work for 15 days: 1/2 work done. 15 men work for 20 days: 1/2 done. total = 1.
ImO D
If my post helped you- let me know by pushing the thanks button ;)

Contact me about long distance tutoring!
[email protected]

Cans!!
Join the discussion

by knight247 » Tue Sep 13, 2011 10:31 pm
Let the work that needs to be completed be the typing of 60 pages

20 Men take 30 days to finish
So the rate for 20 men is 2 pages/day

If 20 mean take 30 days
Then 15 men would take 20*30/15=40 Days (# of men and days are inversely proportional)
So the rate of 15 men is 1.5 pages/day

Let the time worked by 20 men be x hrs
So in x hrs they will complete 2x of the work (work=rate*time)

Let the time worked by 15 mean be y hrs
So in y hrs they will complete 1.5y of the work (work=rate*time)

Now, total work done=60 i.e. 2x+1.5y=60 also x+y=35(as the total time taken by 20 men and 15 men is 35) Multiplying second equation by 2 we have 2x+2y=70 and then subtracting first equation from this we get y=20 and x=15. Which means that 20 workers have worked for 15 hours after which 5 workers left and the remaining 15 workers finished the job in the next 20 hrs. 15 hrs is the answer. Hence [spoiler]D[/spoiler]

I just prefer solving it algebraically!!
Join the discussion

by tailoc » Wed Sep 14, 2011 12:10 am
OA is D
Say that t is day when 5 workers leave
Say that number of units 20workers perform are 600 units.
=> rate = 600/30=20units/20workers=1unit/worker.
So,
Equation: q=r*t
20*1*t + 15*1*(35-t)=600
t=15 days
Join the discussion

by GMATGuruNY » Wed Sep 14, 2011 3:16 am
neya wrote:20 men can finish a piece of work in 30 days.When should 5 men leave the work so that it may be finished in 35 days?

a. 10 days
b. 20 days
c. 25days
d. 15 days
Let rate per man = 1 unit per day.
Rate for 20 men = 20*1 = 20 units per day.
Work completed in 30 days = r*t = 20*30 = 600 units.
Rate after 5 men leave = 20-5 = 15 units per day.

From here, we can plug in the answers, which represent the number of days for which all 20 men should work.
We should start with one of the middle values (either 15 or 20).

Answer choice D: 15 days
Work completed by 20 men in 15 days = r*t = 20*15 = 300 units.
Remaining work = 600-300 = 300 units.
Time for remaining 15 men to produce 300 units = w/r = 300/15 = 20 days.
Total time = 15+20 = 35 days. Success!

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Scott@TargetTestPrep » Tue Dec 12, 2017 9:48 am
neya wrote:20 men can finish a piece of work in 30 days.When should 5 men leave the work so that it may be finished in 35 days?

a. 10 days
b. 20 days
c. 25days
d. 15 days
We are given that 20 workers can complete a job in 30 days. Since rate = work/time, the rate of the 20 workers is 1/30. We can let x be the number of days it would take 5 fewer workers (i.e., 15 workers) to complete the job (from beginning to end); thus the rate of the 15 workers would be 1/x. Let’s determine x using the following proportion:

20/(1/30) = (15)/(1/x)

600 = 15x

40 = x

Thus, the number of days it takes for the 15 workers to complete the job (from beginning to end) is 15 and their rate is 1/40.

However, we need to determine at what point in time 5 of the 20 workers should leave the job so that the work is completed in 35 days. We can let this be t, and note that the work done by the 20 workers in these t days plus the work done by the 15 workers after these t days (i.e., in 35 - t days) will be the complete job. Recall that work = rate x time, so we have:

(1/30)t + (1/40)(35 - t) = 1

t/30 + (35 - t)/40 = 1

Multiplying the equation by 120, we have:

4t + 3(35 - t) = 120

4t + 105 - 3t = 120

t + 105 = 120

t = 15

Answer: D

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion

by GMATWisdom » Tue Dec 12, 2017 10:23 am
neya wrote:20 men can finish a piece of work in 30 days.When should 5 men leave the work so that it may be finished in 35 days?

a. 10 days
b. 20 days
c. 25days
d. 15 days
let one man can break one stone in a day
then 20 men in 30 days would break 20 x 30 = 600 stones
that is the complete work is to break 600 stones.

let us try each option and see with which option 600 stones can be broken

option A.... 20X10+15X25=200+375=575
.......B.....20X20+15X15=400+300=700
Clearly the option should be between A and C which is option D

Hence D is the correct option

we can varify also for option D

20X15+15X20=300+300=600
Join the discussion