BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work

Expert replies
by heshamelaziry » Mon Nov 16, 2009 10:13 pm
Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

1/2

2

3

5

6

OA 6
Last edited by heshamelaziry on Mon Nov 16, 2009 10:31 pm, edited 1 time in total.
Join the discussion
Source: — Problem Solving |

by Abdulla » Mon Nov 16, 2009 10:28 pm
heshamelaziry wrote:Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

1/2

2

3

5

6
IMO E
Let me try it.. correct me if I'm wrong

a + b = 1/3 ------------(1)
2a+b = 1/2 -----> b= 1/2 - 2a -------------(2)

Substitute 2 into 1

a + 1/2 - 2a = 1/3
-a = 1/3 - 1/2
-a = - 1/6
a = 1/6 , which means a can produce one widget in 6 hours.
Abdulla
Join the discussion

by heshamelaziry » Mon Nov 16, 2009 10:38 pm
Abdulla wrote:
heshamelaziry wrote:Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

1/2

2

3

5

6
IMO E
Let me try it.. correct me if I'm wrong

a + b = 1/3 ------------(1)
2a+b = 1/2 -----> b= 1/2 - 2a -------------(2)

Substitute 2 into 1

a + 1/2 - 2a = 1/3
-a = 1/3 - 1/2
-a = - 1/6
a = 1/6 , which means a can produce one widget in 6 hours.
Abdulla,

i know that 1/a + 1/b = 1/3, form here I don't understand. I saw different way fo solving it. Yuor seems simpler.
Join the discussion

by Abdulla » Mon Nov 16, 2009 11:18 pm
heshamelaziry wrote:
Abdulla wrote:
heshamelaziry wrote:Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

1/2

2

3

5

6
IMO E
Let me try it.. correct me if I'm wrong

a + b = 1/3 ------------(1)
2a+b = 1/2 -----> b= 1/2 - 2a -------------(2)

Substitute 2 into 1

a + 1/2 - 2a = 1/3
-a = 1/3 - 1/2
-a = - 1/6
a = 1/6 , which means a can produce one widget in 6 hours.
Abdulla,

i know that 1/a + 1/b = 1/3, form here I don't understand. I saw different way fo solving it. Yuor seems simpler.
Yeah this is a great formula to use but not with those kind of problems where you have variables instead of numbers (rates).
Usually, I use widget/hour when I have for example, A produce 3 widgets in 4 hours and B produce 2 widgets in 3 hours. In this case your formula works best.
Abdulla
Join the discussion

by heshamelaziry » Mon Nov 16, 2009 11:39 pm
How did you get a + b = 1/3 ? I have usually seen this as either 1/a + 1/b = 1/3 or a + b = 3. I understand you solution, but it is the first time i see work problem solved this way, and like to understand the logic.
Join the discussion

by Abdulla » Mon Nov 16, 2009 11:52 pm
heshamelaziry wrote:How did you get a + b = 1/3 ? I have usually seen this as either 1/a + 1/b = 1/3 or a + b = 3. I understand you solution, but it is the first time i see work problem solved this way, and like to understand the logic.
Simply consider the variable as a rate without writing it down as 1/a because at the end you will get a fraction.

if a+b = 1/3, then a and b must be fractions B-)
Abdulla
Join the discussion

by viju9162 » Tue Nov 17, 2009 4:31 am
For this problem, I understood like this:

A+B can produce 1 widget in 3 hours. Therefore, in 1 hour, A+B can produce 1/3 of widget

similarly, 2A+B can produce 1 widget in 2 hours. Hence, 2A+B can produce 1/2 of widget in an hour.

By simplication A = 1/6 . It completes 1/6 th of job . Therefore, it takes 6 hours to do the job alone.

For other types, if A or B value is given, we can determine hourly work rate and try to find the unknown value .

Regards,
Viju
"Native of" is used for a individual while "Native to" is used for a large group
Join the discussion