BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work Rate

Expert replies
by yellowho » Sun Mar 06, 2011 1:28 am
A software programmer does 20% of the work in 80% of the time, and 80% of the work in the remaining 20% of the time. If the code he writes is X lines long and he was given one month (30 days) to accomplish the task, then, assuming that the programmer works at a constant rate in each of the two stages, How many lines of code were written in the last two weeks, in terms of X?
Join the discussion
Source: — Problem Solving |

by Night reader » Sun Mar 06, 2011 2:11 am
Work=w, Time=t --> (2/10)w=(8/10)t, (8/10)w=(2/10)t; t=30 days, w=X lines, last two weeks (1 week is seven days) = (7*2)/30=(7/15)t; The work completed in time --> t-(7/15)t= (8/15)t. This is less than (8/10)t, therefore [8/10 -8/15= 8/30]t there will be completed equivalent 2/10 portion of work (X) --> w=4t OR X=4t, (8/30)t means (2/10)*w/3 OR 2w/30 OR 2X/30=X/15 this much work has been completed. Uncompleted part of work is X-X/15=14X/15

recalculated
yellowho wrote:A software programmer does 20% of the work in 80% of the time, and 80% of the work in the remaining 20% of the time. If the code he writes is X lines long and he was given one month (30 days) to accomplish the task, then, assuming that the programmer works at a constant rate in each of the two stages, How many lines of code were written in the last two weeks, in terms of X?
My knowledge frontiers came to evolve the GMATPill's methods - the credited study means to boost the Verbal competence. I really like their videos, especially for RC, CR and SC. You do check their study methods at https://www.gmatpill.com
Join the discussion

by Anurag@Gurome » Sun Mar 06, 2011 3:26 am
yellowho wrote:A software programmer does 20% of the work in 80% of the time, and 80% of the work in the remaining 20% of the time. If the code he writes is X lines long and he was given one month (30 days) to accomplish the task, then, assuming that the programmer works at a constant rate in each of the two stages, How many lines of code were written in the last two weeks, in terms of X?
80% of 30 days = 24 days and 20% of 30 days = 6 days
20% of X lines = (0.2)X lines and 80% of X lines = (0.8)X lines

We have to find how much did he wrote in last two weeks, i.e. last 14 days.

Now, in first 24 days, he wrote (0.2)X lines.

Hence, in first 16 days of the first 24 days, he wrote 16*(0.2)X/24 = (0.4)X/3 = 4X/30 = 2X/15 lines

Hence, in last 14 days, he wrote [X - 2X/15] = 13X/15 lines of code

Therefore, in last two weeks he wrote 13X/15 lines of code.
Anurag Mairal, Ph.D., MBA
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)

Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/
Join the discussion

by vineeshp » Sun Mar 06, 2011 3:41 am
I took the work done to be X.

Work done in the first 80% of 30 days, ie 24 days, is 0.2 X.
So work done in 1 day is 0.2/24 --> in 16 days is (.2/24) * 16

--> (4/30) X

so remaining work = X - (4/30)X = (26/30) X.
Vineesh,
Just telling you what I know and think. I am not the expert. :)
Join the discussion

by Night reader » Sun Mar 06, 2011 3:58 am
i made miscalc below, should have transversed to work after (8/30)t
@vin your answer is identical to Anurag's with reductions by 2 in nom/denom
Night reader wrote:Work=w, Time=t --> (2/10)w=(8/10)t, (8/10)w=(2/10)t; t=30 days, w=X lines, last two weeks (1 week is seven days) = (7*2)/30=(7/15)t; The work completed in time --> t-(7/15)t= (8/15)t. This is less than (8/10)t, therefore [8/10 -8/15= 8/30]t there will be completed equivalent 2/10 portion of work (X) --> w=4t OR X=4t, (8/30)t means (2/10)*w/3 OR 2w/30 OR 2X/30=X/15 this much work has been completed. Uncompleted part of work is X-X/15=14X/15

recalculated
yellowho wrote:A software programmer does 20% of the work in 80% of the time, and 80% of the work in the remaining 20% of the time. If the code he writes is X lines long and he was given one month (30 days) to accomplish the task, then, assuming that the programmer works at a constant rate in each of the two stages, How many lines of code were written in the last two weeks, in terms of X?
My knowledge frontiers came to evolve the GMATPill's methods - the credited study means to boost the Verbal competence. I really like their videos, especially for RC, CR and SC. You do check their study methods at https://www.gmatpill.com
Join the discussion

by GMATGuruNY » Sun Mar 06, 2011 4:05 am
yellowho wrote:A software programmer does 20% of the work in 80% of the time, and 80% of the work in the remaining 20% of the time. If the code he writes is X lines long and he was given one month (30 days) to accomplish the task, then, assuming that the programmer works at a constant rate in each of the two stages, How many lines of code were written in the last two weeks, in terms of X?
We can plug in our own value for X.

Let X = 120 lines.
20% of the work = .2X = 24 lines.
80% of the time = 24 days.
Rate for first 24 days = w/t = 24/24 = 1 line per day.
Work completed in last 6 days = 120-24 = 96 lines.
Work completed in previous 8 days = r*t = 1*8 = 8 lines.
Total work completed in last 14 days = 96+8 = 104 lines. This is our target.

Now we plug X = 120 into all the answer choices to see which yields our target of 104.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by gmatmachoman » Wed Mar 09, 2011 2:59 am
30 days can be written as = 8+8+8+6 days

we need last 2 weeks (14 days) = 8+6

24 days ------> 0.2X; so for 8 days X/15 days

From stem we know that 0.8X work is done in last 6 days

X/15 (accounting for 8 days) + 4X/5( accounting for 6 days)

= 13X/15
Join the discussion