BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Work Rate Question

Expert replies
by gvosough » Sun Jul 04, 2010 10:21 pm
In the Porter Toy company, the average time required for each of the n production workers to assemble a trainset is t minutes. If all the workers work fulltime how many hours of plant operations will be required to fill an order for 5000 of these train sets?
A) 5000t/60n
B)5000(60)/nt
C)5000nt/60
D)5000(60n)/t
E)60nt/5000

OA: A
Join the discussion
Source: — Problem Solving |

by papgust » Sun Jul 04, 2010 10:30 pm
You could use basic logic here instead of going for calculations.

Firstly, the given time taken to assemble a trainset is t minutes. Question asks for the total time in hours. So, you need to divide by 60 and not multiply by 60. Eliminate B, D, and E.

We need to choose b/w A and C. If only 1 worker assembles 5000 trainsets, the total time taken will be 5000*t/60 hrs. If there are n workers, then divide 5000*t/60 hrs by n. It's 5000*t / 60*n hours.
Download GMAT Math and CR questions with Solutions from Instructors and High-scorers:
https://www.beatthegmat.com/download-gma ... 59366.html

-----------

GO GREEN..! GO VEG..!

Daily Quote:
"Stop feeling sorry for the Butcher if you had to go Veg. The butcher can find another job but the poor animal cannot get back its life"
Join the discussion

by saurabhmahajan » Mon Jul 05, 2010 1:14 am
one doubt.

the problem says about average time.so the total time to assemble one trainset will be nt.so assembling 5000 sets would be 5000nt.
assume 10 people require average 5 min to assemble one set then total time required is 50 min.so 5000 sets would be 5000*50....right?

and sinced asked in hour so divide by 60

therefore i went for option 5000nt/60.

Please correct me.
Thanks and regards,
Saurabh Mahajan

I can understand you not winning,but i will not forgive you for not trying.
Join the discussion

by 4GMAT_Mumbai » Mon Jul 05, 2010 1:19 am
saurabhmahajan wrote:one doubt.

the problem says about average time.so the total time to assemble one trainset will be nt.

Please correct me.
Hi,

I am afraid the flaw lies in this initial assumption. If there are 3 people who take an average of 5 minutes each to construct a train set, will we say that the total time to assemble one train set is 5 * 3 = 15 minutes ? Hence, the expression nt does not make much sense.

Hope this helps. Thanks.
Naveenan Ramachandran
4GMAT, Dadar(W) & Ghatkopar(W), Mumbai
Join the discussion