Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Work Rate Problem

Expert replies
by Abdulla » Thu Jun 18, 2009 3:16 pm
Machine A and machine B are each used to manufacture 660 sprockets. It takes machine A 10 hours longer to produce 660 sprockets than machine B. Machine B produces 10 percent more sprockets per hour than machine A. How many sprockets per hour does machine A produce?

A) 6
B) 6.6
C) 60
D) 100
E) 110

OA is A
Abdulla
Join the discussion
Source: — Problem Solving |

by ssmiles08 » Thu Jun 18, 2009 4:13 pm
For Machine A, let r = rate, t = time.

r*t = 660

Machine B produces 10 hours less than A: t - 10
machine B's rate is 10% faster than A: 1.1r

(1.1r)(t - 10) = 660

set the equations equal to each other since they both equal 660

r*t = (1.1r)(t - 10)

rt = 1.1rt - 11r

1.1rt - rt - 11r = 0

.1t = 11

t = 110

r = 660/110 = 6

(A)
Join the discussion

by avanishjoshi » Thu Jun 18, 2009 11:01 pm
Let the capacity of machine A = A sprockets/hr
Let the capacity of machine B = B sprockets/hr
Let B work for X hours to produce 660 sprockets
Then A(X + 10) = B(X)

But B produces 10% more sprockets per hour than A .Therefore B = 1.1A.

A(X + 10) = 1.1A(X) = > X+10 = 1.1X = > X = 100.

[spoiler]A (100 + 10) = 660 => A = 6 which is the ANSWER[/spoiler]
Join the discussion

Re: Work Rate Problem

by dtweah » Fri Jun 19, 2009 2:59 pm
Abdulla wrote:Machine A and machine B are each used to manufacture 660 sprockets. It takes machine A 10 hours longer to produce 660 sprockets than machine B. Machine B produces 10 percent more sprockets per hour than machine A. How many sprockets per hour does machine A produce?

A) 6
B) 6.6
C) 60
D) 100
E) 110

OA is A
660/ A -660/A+10= 10%(660/(A+10))
10(A+10) -10A =A
10A+100 -10A=A
A=100
660/110=6
Choose A.
Join the discussion

by Scott@TargetTestPrep » Tue Dec 12, 2017 6:37 am
Abdulla wrote:Machine A and machine B are each used to manufacture 660 sprockets. It takes machine A 10 hours longer to produce 660 sprockets than machine B. Machine B produces 10 percent more sprockets per hour than machine A. How many sprockets per hour does machine A produce?

A) 6
B) 6.6
C) 60
D) 100
E) 110
We are given that machine A and machine B are each used to manufacture 660 sprockets; thus the work of each machine is 660. We also are given that it takes machine A 10 hours longer to produce 660 sprockets than it takes machine B, and that machine B produces 10% more sprockets per hour than machine A. If we let the rate of machine A = r, then the rate of machine B = 1.1r.

Since time = work/rate:

The time of machine A = 660/r and the time of machine B = 660/(1.1r) = 600/r

Since machine A takes 10 hours longer to produce 660 sprockets than does machine B, we can create the following equation and determine r:

660/r = 600/r + 10

60/r = 10

60 = 10r

6 = r

Thus, machine A produces 6 sprockets per hour.

Answer: A

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion