Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Work Problem...To Rich EMPOWERgmat

Expert replies
by Mo2men » Wed Mar 29, 2017 5:20 am
Jim can paint 2 houses in one day while Peter can paint 3 houses in 2 days. How long does it take Jim and Peter to paint 7 houses if they work together?

A. 1
B. 2
C. 3
D. 7/2
E. 9/2

OA: B

Dear Rich,

The question is simple:
Rate of both =3.5=7/2 house/day
Time when Working together =7/ 7/2= 2 houses

However, It goes wrong when I try to apply the below equation

Time together= (A)(B)/(A+B)

Jim takes 1/2 day to complete ONE house.
Peter takes 2/3 day to complete ONE house.

Time together= (1/2 *2/3)/(1/2+2/3)= (1/3) / (5/6)= 2/5.........rate combined= 5/2 house/day. It is not same rate as I had earlier.

Where did I go wrong?

Thanks in advance
Join the discussion
Source: — Problem Solving |

by DavidG@VeritasPrep » Wed Mar 29, 2017 5:32 am
(1/2 *2/3)/(1/2+2/3)= (1/3) / (5/6)
Double-check the arithmetic in red :)
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by Brent@GMATPrepNow » Wed Mar 29, 2017 6:13 am
Mo2men wrote:Jim can paint 2 houses in one day while Peter can paint 3 houses in 2 days. How long does it take Jim and Peter to paint 7 houses if they work together?

A. 1
B. 2
C. 3
D. 7/2
E. 9/2

OA: B
ASIDE: since the first 3 answer choices are nice whole numbers, we might consider TESTING the answer choices.

A) 1 day
In 1 day, Jim can paint 2 houses, and Peter can paint 1.5 houses
This gives us a TOTAL of 3.5 houses.
We need a TOTAL of 7 houses.
ELIMINATE A

B) 2 days
In 2 days, Jim can paint 4 houses, and Peter can paint 3 houses
This gives us a TOTAL of 7 houses.
PERFECT!

Answer: B

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by GMATGuruNY » Wed Mar 29, 2017 7:00 am
Mo2men wrote:Jim can paint 2 houses in one day while Peter can paint 3 houses in 2 days. How long does it take Jim and Peter to paint 7 houses if they work together?

A. 1
B. 2
C. 3
D. 7/2
E. 9/2
Let each house = 2 units.

Since Jim takes 1 day to paint 2 houses -- for a total of 4 units -- Jim's rate = w/t = 4/1 = 4 units per day.
Since Peter takes 2 days to paint 3 houses -- for a total of 6 units -- Peter's rate = w/t = 6/2 = 3 units per day.
Combined rate for Jim and Peter = 4+3 = 7 units per day.
To paint 7 houses -- for a total of 14 units -- the required time by Jim and Peter working together = w/r = 14/7 = 2 days.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by [email protected] » Wed Mar 29, 2017 9:59 am
Hi Mo2men,

You absolutely can use the Work Formula on this question. To start

Jim can paint 2 houses in 1 day, so he can paint 1 house in 1/2 of a day
Peter can paint 3 houses in 2 days, so can paint 1 house in 2/3 of a day

Work = (A)(B)/(A+B)

(1/2)(2/3)/(1/2 + 2/3) = (2/6)/(7/6) = 2/7 days to paint 1 house when working together

We're asked how long it takes the two of them to paint 7 houses.... (2/7 day per house)(7 houses) = 2 days

Final Answer: B

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Mo2men » Wed Mar 29, 2017 11:46 am
DavidG@VeritasPrep wrote:
(1/2 *2/3)/(1/2+2/3)= (1/3) / (5/6)
Double-check the arithmetic in red :)
Ouch silly mistake. :(
Join the discussion

by DavidG@VeritasPrep » Wed Mar 29, 2017 12:47 pm
Mo2men wrote:
DavidG@VeritasPrep wrote:
(1/2 *2/3)/(1/2+2/3)= (1/3) / (5/6)
Double-check the arithmetic in red :)
Ouch silly mistake. :(
We've all been there, my friend. All that matters is that you double-check your work on test day!
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by Jeff@TargetTestPrep » Wed Dec 13, 2017 11:07 am
Mo2men wrote:Jim can paint 2 houses in one day while Peter can paint 3 houses in 2 days. How long does it take Jim and Peter to paint 7 houses if they work together?

A. 1
B. 2
C. 3
D. 7/2
E. 9/2

Since Jim can paint 2 houses in 1 day and Peter can paint 3 houses in 2 days, Jim’s rate is 2 and Peter’s rate is 3/2. We need to determine how long it will take them to paint 7 houses when working together. If we let t = the number of days it takes them working together, we can create the following equation and determine t:

2t + (3/2)t = 7

Multiplying the entire equation by 2, we have:

4t + 3t = 14

7t = 14

t = 2

Answer: B