BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work Problem

Expert replies
by Haldiram Bhujiawala » Sat Jul 05, 2014 5:51 am
Q:If 20 engineers and 20 workers can together construct a 20km road in 20 days , then 40 engineers and 40 workers together construct 40km road in how many days ?

Ans.20 days. The answer is correct. I have some confusion regarding the solution. The solution is given as 20 X 20 = 400 man days for 20km road.
i.e workers(20) X days(20) = 400 man-days , so for 40km road: 800 man-days are required. therefore 800/40 = 20 man-days.

My question is why are we multiplying only Workers(20) X Days(20) and not :
Engineers(20) X Workers(20) X Days (20) = 8000 man-days to determine the man days ? Why are we leaving out the engineers from the man-days calculation ?
Maybe I am missing some very simple concept!
Join the discussion
Source: — Problem Solving |

by GMATinsight » Sat Jul 05, 2014 6:09 am
It was simpler to think this way

20 engineers and 20 workers can together construct a 20km road in 20 days
40 engineers and 40 workers together can construct 20km road in half of the days as manpower has been doubled which is inversely proportional to the amount of time taken = 10 days

Now 40 engineers and 40 workers together can construct 40km road in 20 Days [Work and Time are directly proportional.

Manpower x Time / Work = Constant
"GMATinsight"Bhoopendra Singh & Sushma Jha
Most Comprehensive and Affordable Video Course 2000+ CONCEPT Videos and Video Solutions
Whatsapp/Mobile: +91-9999687183 l [email protected]
Contact for One-on-One FREE ONLINE DEMO Class Call/e-mail
Most Efficient and affordable One-On-One Private tutoring fee - US$40-50 per hour
Join the discussion

by GMATinsight » Sat Jul 05, 2014 6:44 am
My question is why are we multiplying only Workers(20) X Days(20) and not :
Engineers(20) X Workers(20) X Days (20) = 8000 man-days to determine the man days ? Why are we leaving out the engineers from the man-days calculation ?
Maybe I am missing some very simple concept!
Engineers and Worker may have different efficiency with which they are working therefore you can't take it the way you are taking(independently).

You have to consider the smallest group of manpower as (1 Engineer and 1 worker) but you can't use their efficiency independently until the relation to convert the Engineer's work into Worker's work is mentioned in the question.
"GMATinsight"Bhoopendra Singh & Sushma Jha
Most Comprehensive and Affordable Video Course 2000+ CONCEPT Videos and Video Solutions
Whatsapp/Mobile: +91-9999687183 l [email protected]
Contact for One-on-One FREE ONLINE DEMO Class Call/e-mail
Most Efficient and affordable One-On-One Private tutoring fee - US$40-50 per hour
Join the discussion

by Haldiram Bhujiawala » Sat Jul 05, 2014 6:48 am
GMATinsight wrote:It was simpler to think this way

20 engineers and 20 workers can together construct a 20km road in 20 days
40 engineers and 40 workers together can construct 20km road in half of the days as manpower has been doubled which is inversely proportional to the amount of time taken = 10 days

Now 40 engineers and 40 workers together can construct 40km road in 20 Days [Work and Time are directly proportional.

Manpower x Time / Work = Constant
Hi Gmatinsight,

I do understand that manpower has been doubled . What I don't understand is that to find the manpower why aren't we multiplying engineer with workers i.e engineers X workers instead of just considering workers or engineers in isolation.i.e (20X20X20X2)/(40X40). Why are we excluding engineers from manpower calculation ?
Last edited by Haldiram Bhujiawala on Sat Jul 05, 2014 7:34 am, edited 3 times in total.
Join the discussion

by GMATinsight » Sat Jul 05, 2014 6:59 am
Engineers(20) X Workers(20) X Days (20) = 8000 man-days
The mistake is explained by this representation. (where you have used X sign it should be + sign as it's the total manpower)

(20 Engineers + 20 Workers) X Days (20)
= 20(1Engineer + 1Worker) X Days (20)
= 400 man-days

Required work = 40 KM = 800 Man Days

(40 Engineers + 40 Workers) X Days (x)
= 40(1Engineer + 1Worker) X Days (x)
= 800 man-days [Required work]

therefore, x = 800/40 = 20 Days
"GMATinsight"Bhoopendra Singh & Sushma Jha
Most Comprehensive and Affordable Video Course 2000+ CONCEPT Videos and Video Solutions
Whatsapp/Mobile: +91-9999687183 l [email protected]
Contact for One-on-One FREE ONLINE DEMO Class Call/e-mail
Most Efficient and affordable One-On-One Private tutoring fee - US$40-50 per hour
Join the discussion

by GMATinsight » Sat Jul 05, 2014 7:02 am
I hope now you can see that where you are using muliplication sign between Engineers and Workers needs to be replaced by addition sign as

1 Engineer and 1 Worker working together means "1 Engineer+1 Engineer"
"GMATinsight"Bhoopendra Singh & Sushma Jha
Most Comprehensive and Affordable Video Course 2000+ CONCEPT Videos and Video Solutions
Whatsapp/Mobile: +91-9999687183 l [email protected]
Contact for One-on-One FREE ONLINE DEMO Class Call/e-mail
Most Efficient and affordable One-On-One Private tutoring fee - US$40-50 per hour
Join the discussion

by GMATGuruNY » Sat Jul 05, 2014 7:03 am
Haldiram Bhujiawala wrote:Q:If 20 engineers and 20 workers can together construct a 20km road in 20 days , then 40 engineers and 40 workers together construct 40km road in how many days ?
Use the following equation:

(workers)(time) / output = (workers)(time) / output

In the equation above:
Workers and time are INVERSELY PROPORTIONAL.
As the number of workers increases, the amount of time required to produce the same output decreases.
Workers and output are DIRECTLY PROPORTIONAL.
As the number of workers increases, the amount of output also increases.
Time and output are also DIRECTLY PROPORTIONAL.
As the amount of time increases, the amount of output also increases.

In the problem above:
(20+20 engineers and workers)(20 days) / (20km of road) = (40+40 engineers and workers)(x days) / (40km of road)
(40)(20) / 20 = (80)(x) / 40
40 = 20x
x = 20 days.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by GMATGuruNY » Sat Jul 05, 2014 8:27 am
Haldiram Bhujiawala wrote: I do understand that manpower has been doubled . What I don't understand is that to find the manpower why aren't we multiplying engineer with workers i.e engineers X workers instead of just considering workers or engineers in isolation.i.e (20X20X20X2)/(40X40). Why are we excluding engineers from manpower calculation ?
The problem is flawed -- and not representative of a typical work problem on the GMAT.
It needs to make clear how the output of the engineers is related to the output of the workers.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Matt@VeritasPrep » Sun Jul 06, 2014 6:10 pm
A MUCH easier way of thinking about this is that you have DOUBLED the work but also DOUBLED the rate, so your time will remain unchanged.

Algebraically, you could represent that this way:

W = R*T

2W = (2R)*T

Notice that T will be the same in the second equation as it was in the first, since you've multiplied both sides by 2 (and the question makes clear that the RATE is doubling on the right hand side, so the 2 and the R can be grouped together).

While the question is awkwardly phrased, it seems clear to me that it was designed to test your ability to notice this sort of elegant solution. (It reminds me of a speed round MATHCOUNTS question that you can answer in five seconds, without any equations, if you catch the trick.)