BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work Problem from GMATprep

Expert replies
by zaarathelab » Sat Oct 15, 2011 4:51 am
Company C has a machine that, working alone at its constant rate, processes 100 units of a certain product in 5 hours. If Company C plans to buy a new machine that will process this product at a constant rate and if the two machines, working together at their respective constant rates, are to process 100 units of this product in 2 hours, what should be the constant rate, in units per hour, of the new machine?
A. 50
B. 45
C. 30
D. 25
E. 20

[spoiler]Initially, i worked it out by making an equation:

(1/20 + 1/x )*2 = 100 x is rate per hour of new machine

I didnt get the right answer through this method.

So, I figured out that if C produces 20 units in an hour, we'll need a machine to produce @ 30 units per hour to produce 100 units in 2 hour.

My question is, where am i going wrong with the equation?[/spoiler]
Success = Max(Hardwork) + Min(Luck)
Join the discussion
Source: — Problem Solving |

by gmatclubmember » Sat Oct 15, 2011 5:02 am
zaarathelab wrote:Company C has a machine that, working alone at its constant rate, processes 100 units of a certain product in 5 hours. If Company C plans to buy a new machine that will process this product at a constant rate and if the two machines, working together at their respective constant rates, are to process 100 units of this product in 2 hours, what should be the constant rate, in units per hour, of the new machine?
A. 50
B. 45
C. 30
D. 25
E. 20

[spoiler]Initially, i worked it out by making an equation:

(1/20 + 1/x )*2 = 100 x is rate per hour of new machine

I didnt get the right answer through this method.

So, I figured out that if C produces 20 units in an hour, we'll need a machine to produce @ 30 units per hour to produce 100 units in 2 hour.

My question is, where am i going wrong with the equation?[/spoiler]

The problem in your answer lies in the inverted rates in your equation.
It should be (x+20)*2=100, x= rate of new machine per hour , 20 = rate of older machine per hour and 2= time (in hours) in which both machines give an output of 100 units.
Solving we get x=30.
a lil' Thank note goes a long way :)!!
Join the discussion

by rohit_gmat » Sat Oct 15, 2011 5:16 am
best way is to add up individual rates (since they are working together).

So the first machine has a rate of = 100 units / 5 hrs = 20 units/hr

And if the first machine with the new machine work toegther, they make 100 units in 2 hrs = 100 /2 = 50 units/hr

so the rate of the new machine must be = 50 - 20 = 30 units/hr
C
Join the discussion