BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work and time problem.please help

Expert replies
by boros2203 » Tue Sep 07, 2010 11:05 am
Machine A, working alone at its constant rate, manufactures 280 bolts per hour, and machine B, working alone at its constant rate, manufactures 220 bolts per hour. How many hours will it take for machines A and B, working together at their respective constant rates, to manufacture 1,000 bolts?

(A) 1
(B) 1.3
(C) 1.5
(D) 1.8
(E) 2

Hi I have a doubt with this question. OA given is E but i am not convinced by it. With E as answer it is suggesting that A and B worked independently for 2hrs each.

Please let me know whether I have interpreted the question wrongly ....[/spoiler]
Join the discussion
Source: — Problem Solving |

by crazy_genius » Tue Sep 07, 2010 11:29 am
Boros,

Working 'together' implies working simultaneously (though independently). when the question says that Mac. A and B work 'together', it means that these machines do not work at different timings and they do not stop in between. Therefore, they will ultimately work 'on their own' or 'independently' ( as used by you), yet they work 'together'

Hence the answer (E) 2 is correct.
~A.K~

The Race is Not Over because I have not won yet...!!!
Join the discussion

by sdotcruz » Tue Sep 07, 2010 11:31 am
E is correct and you are correct that it is like they are working alone for 2 hours. The combined rate would be 500 bolts per hour because after an hour of running the machines you will find one produced 220 bolts and the other 280 bolts. When you were given rates your can combine the rates as R(total) = R(1) +R(2). THis problem seems very straight forward. You may find other instances where you are given the time to complete a job. When you find that type of problem you will need a different formula and the solution will be longer.
Join the discussion

by boros2203 » Tue Sep 07, 2010 11:39 am
Thanks everyone ....
Join the discussion

by Scott@TargetTestPrep » Sat Jul 07, 2018 5:29 pm
boros2203 wrote:Machine A, working alone at its constant rate, manufactures 280 bolts per hour, and machine B, working alone at its constant rate, manufactures 220 bolts per hour. How many hours will it take for machines A and B, working together at their respective constant rates, to manufacture 1,000 bolts?

(A) 1
(B) 1.3
(C) 1.5
(D) 1.8
(E) 2
Since the combined rate is 500 bolts per hour, then it will take 1,000/500 = 2 hours for the two machines to manufacture 1,000 bolts.

Answer: E

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion