BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work and ratio

Expert replies
by maihuna » Thu May 07, 2009 7:58 am
A is 50% more efficient than B. C does half of the work done by A and B together. If C alone can do the work in 40 days then A B C together can do the work in how many days:

13.33
15
17.25
20
30
Join the discussion
Source: — Problem Solving |

by scoobydooby » Thu May 07, 2009 8:59 am
i get 13.33

C does half of the work done by A and B together
=>A+B does double C's work

if C finishes the work alone in 40 days, A+B does double the work in 40days=>A+B does the work in 20days

given, A is 50% more efficient than B=> A takes half number of days as B
let B take x days, A takes x/2 days

in 1 day, A and B does 1/x+2/x=1/20
=>3/x=1/20
=>x=60 days

in 1 day, A, B, C works=1/60+1/30+1/40=3/40 of work
=>work gets completed in 40/3=13.33 days
Join the discussion

by mike22629 » Thu May 07, 2009 9:25 am
Hmm..

I agree with answer but correct me if I am wrong, but you are looking for
1/A + 1/B + 1/C

So you know 1/C = 1/40
and 1/A + 1/B = 2/40 or 1/20

So 1/20+1/40 = 3/40

So total time is 40/3 or 13.333

Isn't this solution faster?

Seems like a weird question because you do not need that one piece of information.

Is this just a coincidence that my answer came up right?

Experts...
Join the discussion

by scoobydooby » Thu May 07, 2009 10:32 am
wow, mike22629 you sure saw through the extra info given in the problem! i like a fool read through each and every line and translated into mathematical form :(

smart thinking.
Join the discussion

by sureshbala » Thu May 07, 2009 12:36 pm
Folks, this can be answered much quickly.

In fact the first statement relating the efficiencies of A and B is not needed.

Given efficiency of C is half that of A and B, which mean A and B can be replaced with 2C.

Now efficiency of A,B and C is same as that of 3C i.e. thrice the efficiency of C.


Given C alone can do it in 40 days.

So time taken by 3C = 1/3 x 40 = 13.33 days
Join the discussion

Re: Work and ratio

by doclkk » Thu May 07, 2009 3:05 pm
maihuna wrote:A is 50% more efficient than B. C does half of the work done by A and B together. If C alone can do the work in 40 days then A B C together can do the work in how many days:

13.33
15
17.25
20
30
I'm not sure if you guys have seen the movie "little big league." But in the movie they discuss a math problem " if i can do something in 10 minutes, and you can do it 6 minutes, how long will it take for us to do together." It's the math problem before their big game.

They use a formula which has stuck with me since I was a kid. I'm surprised that in all my gmat books, I have never seen this formula used.

A*B / A+B.

This formula only works with two variables.Either that, or I just don't know how to apply it with 3.

AB does it in half the time C does it - so essentially you have TWO variables.

So let AB = A and let C = B.

A*B / A+B = 20*40 / 20+40 = 800 /60 or 80/6 or 40 / 3 or 13 1/3.

This I find is the EASIEST formula to remember. Take a break, watch the movie and then you will have one less formula to remember because the formula will leave an indellible mark in your brain.
Join the discussion

Re: Work and ratio

by Ian Stewart » Thu May 07, 2009 5:13 pm
doclkk wrote:
They use a formula which has stuck with me since I was a kid. I'm surprised that in all my gmat books, I have never seen this formula used.

A*B / A+B.
I'd guess you have seen this formula in your GMAT books, just written in a different way. Your version of the formula:

T = AB/(A + B)

is actually identical to this version, which I've seen more often in print:

1/T = (1/A) + (1/B)

Notice with this second formula above, if we get a common denominator on the right, we have:

1/T = (B/AB) + (A/AB)
1/T = (A + B)/AB

and finally, taking reciprocals on both sides, you have:

T = AB/(A + B)

which is the version of the formula you've used.

_____

For two worker problems, I think your version of the formula is easier to work with - using it, you solve for T directly, without needing to take a reciprocal at the end. That said, it's much harder to remember the three-worker version of the formula in the T = ... form, while it's relatively easy to remember 1/T = 1/A + 1/B + 1/C (you can work out the T = ... version of this by following the same steps I did above). That's likely the reason most prep books teach the 1/T = ... version of the formula.

And all of that said, you don't need a formula at all to solve combined rates problems, as I've explained in other posts.
For online GMAT math tutoring, or to buy my higher-level Quant books and problem sets, contact me at ianstewartgmat at gmail.com

ianstewartgmat.com
Join the discussion