Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Widgets

Expert replies
by sampath » Wed Aug 17, 2011 2:37 am
Two types of widgets, namely type A and type B, are produced on a machine. The number of machine
hours available per week is 80. How many widgets of type A must be produced?
(1) One unit of type A widget requires 2 machine hours and one unit of type B widget requires 4
machine hours.
(2) Every week, at least 10 units of type A widgets and at least 15 units of type B widgets must be
produced
Join the discussion
Source: — Problem Solving |

by rppala90 » Wed Aug 17, 2011 5:52 am
M - number of machine hours needed for 1 type A.
N - number of machine hours needed for 1 type B.
80 = (M * A) + (N * B)

Here M & N can be fractions as they represent time.
A & B have to be positive integers.

(1) M = 2 and N = 4.
80 = 2A + 4B ==> 40 = A + 2B.
Not SUFFICIENT. Two variables, 1 equation.
Strike AD
(2) A >= 10 B >= 15.
80 = M (10) + N(15)
Not SUFFICIENT. Two variables, 1 equation.
Strike B.
(1) & (2)
M = 2 and N =4.
A >= 10 and B >=15.
80 = (M * A) + (N * B)
80 = (2 * 10) + (4 * 15) (least possible values of A and B)
= 20 + 60. ( As A and B must be integers only and incresaing value of A will force decreasing value in B; but B must be greater than or equal to 15).
A must be 10 and B must be 15 to satisfy all the conditions.

Hence answer is C[/spoiler]