BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

widgets

Expert replies
by jkwan » Fri Jan 16, 2009 3:57 pm
Running at their respective constant rates, machine X takes 2 days longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5/4 w widgets in 3 days, how many days would it take machine X alone to produce 2w widgets?

A. 4
B. 6
C. 8
D. 10
E. 12
Join the discussion
Source: — Problem Solving |

by sonu_thekool » Fri Jan 16, 2009 5:50 pm
I would choose E.

X alone takes 12 days to produce 2w widgets.

Let n be the number of days Y takes to produce w widgets. So rate of work for Y is w/n.

X takes 2 more days than Y to produce w widgets. So, rate of work for X is w/(n+2).

Both combined can produce 5/4w widgets in 3 days - so, in one day they both can produce 5/12w widgets.

w/n + w/(n+2) = 5/12w

Solving for n (we can eliminate w in the process) will give us n=4.

X takes 6 days to produce w widgets

So, 12 days to produce 2w widgets.
Join the discussion

by jkwan » Sat Jan 17, 2009 11:03 am
sonu_thekool wrote:I would choose E.

X alone takes 12 days to produce 2w widgets.

Let n be the number of days Y takes to produce w widgets. So rate of work for Y is w/n.

X takes 2 more days than Y to produce w widgets. So, rate of work for X is w/(n+2).

Both combined can produce 5/4w widgets in 3 days - so, in one day they both can produce 5/12w widgets.

w/n + w/(n+2) = 5/12w

Solving for n (we can eliminate w in the process) will give us n=4.

X takes 6 days to produce w widgets

So, 12 days to produce 2w widgets.
Thank you, sonu_thekool, for solving the problem. The answer is indeed E.

My Algebra is a little rusty, so can you clue me in how you get 4 when you use 1/n + 1/(n+2) = 5/12?

Thanks!
Join the discussion

by sonu_thekool » Sat Jan 17, 2009 1:23 pm
jkwan wrote:My Algebra is a little rusty, so can you clue me in how you get 4 when you use 1/n + 1/(n+2) = 5/12?

Thanks!
No problem. Here are the steps.

Taking common denominator. n * (n+2) = n^2 + 2n
Left hand side of the equation would be n+2+n / (n^2 +2n)

Cross multiplying
(2n+2)*12 = 5(n^2 + 2n)
24n + 24 = 5n^2 + 10n
5n^2 - 14n -24 = 0

this equation can be split into two
(5n-20) and (6n-24) each equal to 0

So, 5n = 20 and n = 4.

Hope this is clear.
Join the discussion