Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

water filling

Expert replies
by trust123 » Sat Jul 18, 2009 10:56 am
please see the attached file and ans
You do not have the required permissions to view the files attached to this post.
Join the discussion
Source: — Problem Solving |

by truplayer256 » Sat Jul 18, 2009 11:10 am
/A+1/B=5/6---(1)

1/A+1/C=2/3---(2)

1/B+1/C=1/2---(3)

(2)-(3)=1/A-1/B=1/6---(4)

(4)+(1)=2/A=1

A=2

Now substitute A into equations 1, 2, 3, or 4 to get B and C.

B=3

C=6

1/A+1/B+1/C=1/X

X= The number of hours it takes pumps A, B, and C, operating simultaneously to fill the tank

1/2+1/3+1/6=1/X

1=1/X

X=1 hour.
Join the discussion

by gmat740 » Sat Jul 18, 2009 11:20 am
Its a very simple question.
We have 3 equations from Work-time theory.

1/a + 1/b = 5/6

1/b + 1/c = 1/2

1/c +1/a = 2/3

add all the 3

2*(1/a + 1/b + 1/c) = 2

(1/a + 1/b + 1/c) = 1

so,answer 1 hr.

A point of advice, please revise some basic Quant concepts, so that you don't get caught up with these simple questions.

Hope this helps
Join the discussion

by shibal » Sun Jul 19, 2009 9:54 am
gmat740, why do you multiply by 2 the addition?
Join the discussion

by PussInBoots » Sun Jul 19, 2009 3:31 pm
1/a + 1/b + 1/a + 1/c + 1/b + 1/c = 2 * (1/a + 1/b + 1/c)
Join the discussion

by gmat740 » Sun Jul 19, 2009 5:09 pm
shibal wrote:gmat740, why do you multiply by 2 the addition?
When you add all the 3 three equations wriiten below:
1/a + 1/b = 5/6

1/b + 1/c = 1/2

1/c +1/a = 2/3
LHS = (1/a +1/b) +( 1/b + 1/c) +(1/c +1/a )

We can see that we have 2(1/a) , 2(1/b) and 2(1/c)

thus it can be simplified as 2*(1/a +1/b +1/c)

Hope this Helps
Join the discussion

by shibal » Sun Jul 19, 2009 5:48 pm
thanks,i got it, but why do you do the following?

2*(1/a + 1/b + 1/c) = 2

why equal to 2?
Join the discussion

by jba05d » Sun Jul 19, 2009 7:21 pm
shibal,

Think of the equations this way:

a + b = 5/6

a + c = 2/3

b + c = 1/2

where, a, b, and c represent the work rates of a, b, and c.

a + b + a + c + b + c = 5/6 + 2/3 + 1/2

2a + 2b + 2c = 5/6 + 4/6 + 3/6

2a + 2b + 2c = 12/6

2a + 2b + 2c = 2

This above equation tells us that it takes 2 of each of the workers 1/2 hour to complete the job. But, we only need one of each worker. Therefore factor the 2.

2(a + b + c) = 2

a + b + c = 1

Therefore, a, b, and c working together complete the job in 1 hour.
Join the discussion