Start the planVictor's job requires to him complete a series of identical jobs. If Victor is supervised at work, he finishes each job three days faster than if he is unsupervised. If Victor works for \(144\) hours and is supervised for half the time, he will finish a total of \(36\) jobs. How long would it take Victor to complete \(10\) jobs without any supervision?
A. \(34\)
B. \(52\)
C. \(60\)
D. \(70\)
E. \(92\)
The AO is C