BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

very tricky thing

Expert replies
by tanviet » Sat Sep 12, 2009 8:02 pm
Running at their respective constant rate, machine X takes 2 days longer to produce w widgets than machines Y. AT these rates, if the two machines together produce 5w/4 widgets in 3 days, how many days would it take machine X alone to produce 2w widgets.

a, 4
b, 6,
c, 8
d, 10
e, 12

remember you have only 5 minites to solve this one. Pls, realize the problem inhere
Join the discussion
Source: — Problem Solving |

by gmat740 » Sat Sep 12, 2009 8:31 pm
First of all, your target time must be less than 2 mints!

X=> d+2
Y => d

Let time to produce together w widgets = t
=> 1/t = 1/d+2 + 1/d
=> t = d(d+2)/2d+2

So, time to produce 5/4w widgets = 5/4t
= 5/4[d(d+2)/2d+2]
Its given that this 5/4t = 3 days

3 = 5/4[d(d+2)/2d+2]

5d^2 + 10d -24 = 0
(5d+12)(d-2)

d=2

X = d+2 = 4 days to produce w widgets
thus, 8 days to produce 2w widgets.

The solving is very simple if you do on paper

Hope this Helps
Join the discussion

Re: very tricky thing

by umaa » Sat Sep 12, 2009 9:30 pm
duongthang wrote:Running at their respective constant rate, machine X takes 2 days longer to produce w widgets than machines Y. AT these rates, if the two machines together produce 5w/4 widgets in 3 days, how many days would it take machine X alone to produce 2w widgets.

a, 4
b, 6,
c, 8
d, 10
e, 12

remember you have only 5 minites to solve this one. Pls, realize the problem inhere
IMO E.

The number of days x takes to produce w widgets is, A
The number of days y takes to produce w widgets is, B

A = B+2

For 3 days,

3*W/A + 3*W/B = 5W/4

Substitute, B = A-2,

3*W/A + 3*W/(A-2) = 5W/4

24WA - 24W = 5WA^2 - 10WA

5WA^2 - 34WA + 24W = 0

Divide W,

5A^2 - 34A + 24 = 0

Approximately, A = 6 fpr W

For 2W, its 12.

OA pls. Also, pls post the source of the question.
What we think, we become
Join the discussion

by tanviet » Tue Sep 15, 2009 8:40 pm
OA is E

this question from 15 test set. a good sourse.

the matter is that

how can you factor the operation with x^2 to find the solution

this can be done easily if the operation is simple as in almost OG questions. however. is this case, factoring is not easy and take a lot of time to do. we do not have to solve by counting M=B^2-4ac

pls comment.
Join the discussion

by blr_gmat_prep » Tue Sep 15, 2009 10:09 pm
Production of w widgets:
Machine X (from the options): 2,3,4,5,6
Machine Y:0,1,2,3,4

Since answer is given in terms of 2w , we can half the values to get for w widgets.

Rule out option A since Y cant be 0.

we know that together X,Y produce W widgets in XY/(X+Y) days.
So they will produce 5w/4 in 5w/4*(XY)/((X+Y)) => 3 (As given in the question)

Putting C. we get 10/6 days so we have to go higher.
Putting E we get the value as 3 days.
Join the discussion

by vivekjaiswal » Tue Sep 15, 2009 10:28 pm
blr_gmat_prep wrote:Production of w widgets:
Machine X (from the options): 2,3,4,5,6
Machine Y:0,1,2,3,4

Since answer is given in terms of 2w , we can half the values to get for w widgets.

Rule out option A since Y cant be 0.

we know that together X,Y produce W widgets in XY/(X+Y) days.
So they will produce 5w/4 in 5w/4*(XY)/((X+Y)) => 3 (As given in the question)

Putting C. we get 10/6 days so we have to go higher.
Putting E we get the value as 3 days.
This is by far the best way to solve the problem and would be the only one to give an answer within 2 mins.

Thanks blr_gmat_prep

Cheers,
Vivek
Join the discussion