Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

very tricky thing

Expert replies
by tanviet » Sat Sep 12, 2009 8:02 pm
Running at their respective constant rate, machine X takes 2 days longer to produce w widgets than machines Y. AT these rates, if the two machines together produce 5w/4 widgets in 3 days, how many days would it take machine X alone to produce 2w widgets.

a, 4
b, 6,
c, 8
d, 10
e, 12

remember you have only 5 minites to solve this one. Pls, realize the problem inhere
Join the discussion
Source: — Problem Solving |

by gmat740 » Sat Sep 12, 2009 8:31 pm
First of all, your target time must be less than 2 mints!

X=> d+2
Y => d

Let time to produce together w widgets = t
=> 1/t = 1/d+2 + 1/d
=> t = d(d+2)/2d+2

So, time to produce 5/4w widgets = 5/4t
= 5/4[d(d+2)/2d+2]
Its given that this 5/4t = 3 days

3 = 5/4[d(d+2)/2d+2]

5d^2 + 10d -24 = 0
(5d+12)(d-2)

d=2

X = d+2 = 4 days to produce w widgets
thus, 8 days to produce 2w widgets.

The solving is very simple if you do on paper

Hope this Helps
Join the discussion

Re: very tricky thing

by umaa » Sat Sep 12, 2009 9:30 pm
duongthang wrote:Running at their respective constant rate, machine X takes 2 days longer to produce w widgets than machines Y. AT these rates, if the two machines together produce 5w/4 widgets in 3 days, how many days would it take machine X alone to produce 2w widgets.

a, 4
b, 6,
c, 8
d, 10
e, 12

remember you have only 5 minites to solve this one. Pls, realize the problem inhere
IMO E.

The number of days x takes to produce w widgets is, A
The number of days y takes to produce w widgets is, B

A = B+2

For 3 days,

3*W/A + 3*W/B = 5W/4

Substitute, B = A-2,

3*W/A + 3*W/(A-2) = 5W/4

24WA - 24W = 5WA^2 - 10WA

5WA^2 - 34WA + 24W = 0

Divide W,

5A^2 - 34A + 24 = 0

Approximately, A = 6 fpr W

For 2W, its 12.

OA pls. Also, pls post the source of the question.
What we think, we become
Join the discussion

by tanviet » Tue Sep 15, 2009 8:40 pm
OA is E

this question from 15 test set. a good sourse.

the matter is that

how can you factor the operation with x^2 to find the solution

this can be done easily if the operation is simple as in almost OG questions. however. is this case, factoring is not easy and take a lot of time to do. we do not have to solve by counting M=B^2-4ac

pls comment.
Join the discussion

by blr_gmat_prep » Tue Sep 15, 2009 10:09 pm
Production of w widgets:
Machine X (from the options): 2,3,4,5,6
Machine Y:0,1,2,3,4

Since answer is given in terms of 2w , we can half the values to get for w widgets.

Rule out option A since Y cant be 0.

we know that together X,Y produce W widgets in XY/(X+Y) days.
So they will produce 5w/4 in 5w/4*(XY)/((X+Y)) => 3 (As given in the question)

Putting C. we get 10/6 days so we have to go higher.
Putting E we get the value as 3 days.
Join the discussion

by vivekjaiswal » Tue Sep 15, 2009 10:28 pm
blr_gmat_prep wrote:Production of w widgets:
Machine X (from the options): 2,3,4,5,6
Machine Y:0,1,2,3,4

Since answer is given in terms of 2w , we can half the values to get for w widgets.

Rule out option A since Y cant be 0.

we know that together X,Y produce W widgets in XY/(X+Y) days.
So they will produce 5w/4 in 5w/4*(XY)/((X+Y)) => 3 (As given in the question)

Putting C. we get 10/6 days so we have to go higher.
Putting E we get the value as 3 days.
This is by far the best way to solve the problem and would be the only one to give an answer within 2 mins.

Thanks blr_gmat_prep

Cheers,
Vivek
Join the discussion