Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Two musicians, Maria and Perry, work at independent constant rates to tune a warehouse full of instruments. If both

Expert replies
by M7MBA » Wed May 20, 2020 7:12 am
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

Two musicians, Maria and Perry, work at independent constant rates to tune a warehouse full of instruments. If both musicians start at the same time and work at their normal rates, they will complete the job in 45 minutes. However, if Perry were to work at twice Maria’s rate, they would take only 20 minutes. How long would it take Perry, working alone at his normal rate, to tune the warehouse full of instruments?

A. 1 hr 20 min
B. 1 hr 45 min
C. 2 hr
D. 2 hr 20 min
E. 3 hr

[spoiler]OA=E[/spoiler]

Source: Manhattan GMAT
Join the discussion
Source: — Problem Solving |

You might want to do this in the traditional fraction way, however I hate that method. I always take a number which will be easily dividable by the given numbers and then proceed - for such work problems.

How to chose that number? Okay 45 mins and 20 mins are basically 3/4 and 1/3 of an hour. LCM of 4 and 3 is 12. So I will take 120 as the TOTAL WORK TO BE DONE.
We will first solve the second condition,
=> Perry (x) works at twice the rate of Martha (y)
=> x=2y

Now the condition says they can complete the work in 20 mins which is 1/3 of an hour. Hence the equation boils down to
=> 1(x+y)/3=120
But x=2y
=>3y/3=120
=y=120

Now, According to first condition
=> 3(x+y)/4 =120
=>3x+3y=480
From previous condition y=120
=>3x+3(120)=480
=> 3x = 480-360
=>3x = 120
=> x=40

Which is the answer. Hope this was helpful.
Join the discussion

M7MBA wrote: ↑
Wed May 20, 2020 7:12 am
Two musicians, Maria and Perry, work at independent constant rates to tune a warehouse full of instruments. If both musicians start at the same time and work at their normal rates, they will complete the job in 45 minutes. However, if Perry were to work at twice Maria’s rate, they would take only 20 minutes. How long would it take Perry, working alone at his normal rate, to tune the warehouse full of instruments?

A. 1 hr 20 min
B. 1 hr 45 min
C. 2 hr
D. 2 hr 20 min
E. 3 hr

[spoiler]OA=E[/spoiler]

Solution:

We can let the time it takes Perry to complete the job alone = p and the time it takes Maria to complete the job alone = m. Thus, Perry’s rate = 1/p and Maria’s rate = 1/m. Since they complete the job in 45 minutes, we use the formula work = rate x time to get:

(1/m)45 + (1/p)45 = 1

45/m + 45/p = 1

Multiplying the entire equation by mp, we have:

45p + 45m = mp

We are also given that if Perry were to work at twice Maria’s rate, they would take only 20 minutes. Since Maria’s rate is 1/m, Perry’s rate would be 2/m. We can create the following equation to determine p:

(2/m)20 + (1/m)20 = 1

40/m + 20/m = 1

Multiplying the entire equation by m, we have:

40 + 20 = m

m = 60

Recalling that 45p + 45m = mp, we can substitute m = 60 in the equation and solve for p:

45p + 45(60) = 60p

3p + 3(60) = 4p

180 = p

Since Perry’s time is 180 minutes, and 60 minutes = 1 hour, it takes him 3 hours to complete the job at his normal rate.

Alternate Solution:

Mary working together with Perry working at twice Mary’s rate is equivalent to three people working together at Mary’s rate. Since the job is finished in 20 minutes under these conditions, it takes Mary 3 x 20 = 60 minutes to finish the job alone.

Since Mary and Perry can finish the job together in 45 minutes, we have:

1/60 + 1/P = 1/45

1/P = 1/45 - 1/60

1/P = 4/180 - 3/180 = 1/180

So, working alone, Perry can finish the job in 180 minutes = 3 hours.

Answer: E

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion