Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Toy Factory Machine

Expert replies
by BTGmoderatorDC » Sun Sep 10, 2017 2:07 am
Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50

How to come up with the right answer?
What is the perfect solution to this problem? Can some experts help me?


OA A
Join the discussion
Source: — Problem Solving |

by Jay@ManhattanReview » Sun Sep 10, 2017 4:11 am
lheiannie07 wrote:Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50
How to come up with the right answer?
What is the perfect solution to this problem? Can some experts help me?
OA A
Given that in 3 minutes, an old machine can assemble 1 toy, thus in 1 hour (= 60 minutes), it can assemble [1*(30/3)] = 20 toys

Say there are 100 old machines.

Thus, in 1 hour, 100 old machines can assemble 20*100 = 2000 toys.

Now, 40% of the machine is replaced by new machines.
Thus, the number of new machines = 40, and old machines = 100 – 40 = 60

Given that in 2 minutes, a new machine can assemble 1 toy, thus in 1 hour (= 60 minutes), it can assemble [1*(30/2)] = 30 toys

Now, the number of toys produced in 1-hour = (Number of toys produced by old machines) + (Number of toys produced by new machines)

= 20*60 + 30*40 = 1200 + 1200 = 2400 toys

Percent increase in the number of toys assembled = [(2400 – 2000)/2000]*100% = 20%.

The correct answer: A

Hope this helps!

Download free ebook: Manhattan Review GMAT Quantitative Question Bank Guide

-Jay
_________________
Manhattan Review GMAT Prep

Locations: New York | Jakarta | Nanjing | Berlin | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

by [email protected] » Sun Sep 10, 2017 9:42 am
Hi lheiannie07 ,

This question can be solved by TESTing VALUES.

We're told that each machine can currently create one toy every 3 minutes. We're then told that 40 percent of the machines will be replaced by new machines that can assemble one toy every 2 minutes. We're asked for the percent increase in the number of toys assembled in one hour by all the machines at the factory.

Since we're replacing 40% of the machines, let's TEST 5 total machines.
One toy every 3 minutes = 20 toys/hour
One toy every 2 minutes = 30 toys/hour

Original Machines
(5 machines)(20 toys/hour) = 100 toys/hour produced

New 'mix' of Machines
(3 machines)(20 toys/hour) = 60 toys/hour produced
(2 machines)(30 toys/hour) = 60 toys/hour produced
Total = 120 toys/hour produced

Percent Change = (New - Old)/(Old) = (120 - 100)/100 = 20/100 = 20%

Final Answer: A

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Scott@TargetTestPrep » Tue Oct 23, 2018 6:19 pm
BTGmoderatorDC wrote:Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50

The rate of one old machine is 20 toys per hour. The rate of one new machine is 30 toys per hour.

Let’s assume that there are 10 old machines. So, before any of them are replaced, the number of toys produced in an hour is 10 x 20 = 200.

Since 40 percent of the old machines are replaced with new machines, we have now 6 old machines and 4 new machines, and the number of toys produced in an hour is 6 x 20 + 4 x 30 = 240.

Therefore, the the percent increase in the productivity per hour is:

(New - Old)/Old x 100 = (240 - 200)/200 x 100 = 40/200 x 100 = 20 percent

Answer: A

Scott Woodbury-Stewart
Founder and CEO