Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Time & Work

Expert replies
by sukhman » Tue Nov 05, 2013 4:26 am
To do a certain work , C alone takes thrice as long as A & B together. A alone would take as long as B& C together . All three together complete the work in 3 days. How long would each take separately ?
Please solve this question No choices are there !
Join the discussion
Source: — Problem Solving |

by ganeshrkamath » Tue Nov 05, 2013 5:52 am
sukhman wrote:To do a certain work , C alone takes thrice as long as A & B together. A alone would take as long as B& C together . All three together complete the work in 3 days. How long would each take separately ?
Please solve this question No choices are there !
A's rate of work = 1/a
B's rate of work = 1/b
Their combined rate of work = 1/a + 1/b
sukhman wrote:C alone takes thrice as long as A & B together
C's rate of work = 1/c = 1/3 * (1/a + 1/b)
sukhman wrote:All three together complete the work in 3 days
Combined rate of work of A,B, and C = 1/a + 1/b + 1/c
= 1/a + 1/b + 1/3 * (1/a + 1/b)
= 4/3 (1/a + 1/b) = 1/3
1/a + 1/b = 1/4_______________(1)
1/c = 1/12
sukhman wrote:A alone would take as long as B& C together
1/a = 1/b + 1/c
1/a = 1/b + 1/12
1/a - 1/b = 1/12_______________(2)

(1) + (2) => 2/a = 1/3
1/a = 1/6

1/b = 1/12

A alone takes 6 days.
B alone takes 12 days.
C alone takes 12 days.

Cheers
Every job is a self-portrait of the person who did it. Autograph your work with excellence.

Kelley School of Business (Class of 2016)
GMAT Score: 750 V40 Q51 AWA 5 IR 8
https://www.beatthegmat.com/first-attemp ... tml#688494
Join the discussion

by GMATGuruNY » Tue Nov 05, 2013 6:22 am
sukhman wrote:To do a certain work , . A alone would take as long as B& C together . All three together complete the work in 3 days. How long would each take separately ?
Please solve this question No choices are there !
Let A = A's rate alone, B = B's rate alone, and C = C's rate alone.

A alone would take as long as B and C together.
In other words, A is as fast as B and C together:
A = B + C.

C alone takes thrice as long as A & B together.
In other words, A and B together are 3 times as fast as C:
A + B = 3C
A = 3C - B.

Since B+C = A and 3C-B = A, we get:
B+C = 3C-B
2B = 2C
B=C.

Let B=1 unit per hour and C=1 unit per hour.
Since A = B+C, A = 1+1 = 2 units per hour.
Combined rate for A+B+C = 2+1+1 = 4 units per hour.
Since A+B+C take 3 days to complete the job, the amount of work = r*t = 4*3 = 12 units.

Time for A alone to produce 12 units = w/r = 12/2 = 6 days.
Time for B alone to produce 12 units = w/r = 12/1 = 12 days.
Time for C alone to produce 12 units = w/r = 12/1 = 12 days.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Patrick_GMATFix » Sun Nov 10, 2013 2:49 pm
Tough question, but can be solved easily, without much math.

Image

-Patrick
  • Ask me about tutoring.
Join the discussion

by Mathsbuddy » Mon Nov 11, 2013 8:45 am
While I don't dispute the above answers, which are totally correct, I do wish to throw in a different (and wrong) answer to amuse:

If A and C individually takes 4.5 days alone, but together work inefficiently, taking turns to do the work, while the other sips tea and eats sandwiches, thereby taking 9 days together;
and if B's motivational presence with either or both of them knocks 1.5 days off their time, then the times for them individually are:

A = 4.5 days
C = 4.5 days
B = -1.5 days!!!

Check it out. The maths works!
As the given information about B is always with another worker, and the question does not state that A,B or C are constants, then the following is quite a realistic answer (relating to true people behaviour):

A alone = 4.5 days
C alone = 4.5 days
B alone = 0 days (as he doesn't work - he/she stands with a whip)
B with other(s) reduces production time by 1.5 days.
A and C together work at 50% power due to chatting too much and drinking tea!
Join the discussion