Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Time formula - no answer choices

Expert replies
by SaraLotfy » Wed Oct 02, 2013 9:24 am
At supersonic corporation, the time required for a machine to complete a job is determined by the formula t= Sqrt/W + Sqrt/(W+1) where W= the weight of the machine in pounds and t=the hours required to complete the job. If machine A weighs 8 pounds, and machine B weighs 7 pounds, how many hours will it take the two machines to complete the job together?
Join the discussion
Source: — Problem Solving |

by theCodeToGMAT » Wed Oct 02, 2013 9:30 am
SaraLotfy wrote:At supersonic corporation, the time required for a machine to complete a job is determined by the formula t= Sqrt/W + Sqrt/(W+1) where W= the weight of the machine in pounds and t=the hours required to complete the job. If machine A weighs 8 pounds, and machine B weighs 7 pounds, how many hours will it take the two machines to complete the job together?
Do you mean
t= Sqrt/W + Sqrt/(W+1)
or t = sqrt(W) + sqrt(W+1)
or t = sqrt(1/W) + sqrt(1/(W+1))

Sorry, i couldn't understand what you meant to write...
R A H U L
Join the discussion

by SaraLotfy » Wed Oct 02, 2013 9:32 am
Sorry if it's unclear. The equation is t = sqrt(W) + sqrt(W+1)
Join the discussion

by theCodeToGMAT » Wed Oct 02, 2013 9:38 am
Total time = AB/(A+B)

A = √8 + √9 = 2√2 + 3
B = √7 + √8 = √7 + 2√2

So, (2√2 + 3)(√7 + 2√2)/(2√2 + 3 + √7 + 2√2)
R A H U L
Join the discussion

by SaraLotfy » Wed Oct 02, 2013 9:58 am
Hmmm I kinda understood the question differently. Since the question says "working together" I added the weights as if it's one machine weighing W=8+7=15.

As in the rate problems where we add the rates of both machines to reach a combined rate
Join the discussion

by SaraLotfy » Wed Oct 02, 2013 10:00 am
theCodeToGMAT wrote:Total time = AB/(A+B)

A = √8 + √9 = 2√2 + 3
B = √7 + √8 = √7 + 2√2

So, (2√2 + 3)(√7 + 2√2)/(2√2 + 3 + √7 + 2√2)

Why do you use this equation for time -----> Total time = AB/(A+B)
when the question specifies another equation
Join the discussion

by theCodeToGMAT » Wed Oct 02, 2013 10:05 am
SaraLotfy wrote: Why do you use this equation for time -----> Total time = AB/(A+B)
when the question specifies another equation
This came from this formula:

1/t = 1/A + 1/B

So t = AB/(A+B)

Also, the question has given the general equation and not of total time. So we need to use the same equation for both Machines.

Sara, Do you have answer for this question?
R A H U L
Join the discussion