Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

time and work

Expert replies
by ultrasound » Wed Jul 06, 2016 8:53 am
A is 80% as efficient as B. C does two-third of the work done by A and B together in the same time. If C alone does the work in 10 Days. Then A and C, together can do the work in........
(A) 12 days (B) 24 days
(C) 18 days (D) 6 Days

plz help me i m stuck in this question..
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Wed Jul 06, 2016 10:06 am
ultrasound wrote:A is 80% as efficient as B. C does two-third of the work done by A and B together in the same time. If C alone does the work in 10 Days. Then A and C, together can do the work in........
(A) 12 days (B) 24 days
(C) 18 days (D) 6 Days

plz help me i m stuck in this question..
Let B's rate = 15 widgets per day.
Since A is 80% as efficient as B, A's rate = (80/100)(15) = (4/5)(15) = 12 widgets per day.

Combined rate for A and B = 15+12 = 27 widgets per day.
Since C does two-thirds of the work done by A and B, C's rate = (2/3)(27) = 18 widgets per day.
Since C completes the job in 10 days, the total job = (C's rate)(C's time) = (18)(10) = 180 widgets.

Combined rate for A and C = 12+18 = 30 widgets per day.
Time for A and C together to produce 180 widgets = w/r = 180/30 = 6 days.

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Matt@VeritasPrep » Thu Jul 07, 2016 3:03 pm
Let's get the rates first.

C = 1/10 per day
C = (2/3)(A + B), so (A + B) = 3/20
A = (4/5)B, so A + (5/4)A = 3/20, and A = 1/15 per day

A + C = 1/10 + 1/15 = 1/6, so they'll do the job in 6 days.
Join the discussion

by Matt@VeritasPrep » Thu Jul 07, 2016 3:04 pm
That said, there is a SCREAMINGLY easy answer hidden right in front of us!

Since C alone can do the work in 10 days, A + C must be less than 10 days.

Only D is less than 10 days, so we're done ... in five seconds. :D
Join the discussion

by OptimusPrep » Thu Jul 14, 2016 11:01 pm
ultrasound wrote:A is 80% as efficient as B. C does two-third of the work done by A and B together in the same time. If C alone does the work in 10 Days. Then A and C, together can do the work in........
(A) 12 days (B) 24 days
(C) 18 days (D) 6 Days

plz help me i m stuck in this question..
Assume the work rate B = B units/hour
Work rate of A = 0.8B units/hour

Work done by A and C together = 1.8B
Hence the work rate of C = 2/3*1.8B = 1.2B units/hour

Time taken by C alone = 10 days.
Hence total units of work = 1.2B*10 = 12B

Time taken by A and C together = 12B/2B = 6 days

Correct Option: D