BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

time and work

Expert replies
by coolhabhi » Tue Nov 19, 2013 1:02 pm
To do a certain work B would take three times as long as A and C together. And C twice as long as A and B together. The the men complete the work together in 10 days. How long would each one of them take?

A) 22,40,35
B) 18,36,42
C) 24,40,30
D) 22,36,40

I need a simple solution. I did get the answer for this though after quite a while.
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Tue Nov 19, 2013 1:57 pm
coolhabhi wrote:To do a certain work B would take three times as long as A and C together. And C twice as long as A and B together. The the men complete the work together in 10 days. How long would each one of them take?

A) 22,40,35
B) 18,36,42
C) 24,40,30
D) 22,36,40
Let A = A's rate, B = B's rate, and C = C's rate.
TIME and RATE are RECIPROCALS:
Three times as long implies 1/3 as fast.
Twice as long implies 1/2 as fast.

B would take three times as long as A and C together.
Thus, B is 1/3 as fast as A and C together:
B = (1/3)(A+C)
3B = A+C.

C would take twice as long as A and B together.
Thus, C is 1/2 as fast as A and B together:
C = (1/2)(A+B)
2C = A+B.

Subtracting the second equation from the first, we get:
3B - 2C = (A+C) - (A+B)
4B = 3C
B:C = 3:4.

Since B and C's RATE RATIO = 3:4, their TIME RATIO = 4:3.
Implication:
For every 4 hours that B works, C works for 3 hours.
Of the answer choices, only C offers the required time ratio:
24, 40, 30.

The correct answer is C.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by ganeshrkamath » Tue Nov 19, 2013 10:33 pm
coolhabhi wrote:To do a certain work B would take three times as long as A and C together. And C twice as long as A and B together. The the men complete the work together in 10 days. How long would each one of them take?

A) 22,40,35
B) 18,36,42
C) 24,40,30
D) 22,36,40

I need a simple solution. I did get the answer for this though after quite a while.
Rate at which A works = 1/a
Rate at which C works = 1/c
Rate at which B works = 1/b

1/b = 1/3 * (rate at which A and C work together)
1/b = 1/3 * (1/a + 1/c)
3/b = 1/a + 1/c_____________________(1)

1/c = 1/2 * (rate at which A and B work together)
1/c = 1/2 * (1/a + 1/b)
2/c = 1/a + 1/b_____________________(2)

1/a + 1/b + 1/c = 1/10
From (1)
3/b + 1/b = 1/10
b = 40

1/a + 1/b + 1/c = 1/10
From (2)
2/c + 1/c = 1/10
c = 30

Choose C

Cheers
Every job is a self-portrait of the person who did it. Autograph your work with excellence.

Kelley School of Business (Class of 2016)
GMAT Score: 750 V40 Q51 AWA 5 IR 8
https://www.beatthegmat.com/first-attemp ... tml#688494
Join the discussion