Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Time and work related

Expert replies
by guerrero » Tue Mar 05, 2013 1:35 am
A can do a piece of work in 10 days, B in 15 days. They work for 5 days. The rest of work finished by C in 2 days. If they get $1500 for the whole work, the daily wages of B and C are how much ?

a)150
b)225
c)250
d)300
e)450


As 1 day work - 1/10
B's 1 day work -1/15

Their 5 day work to gather is = 5/6
Remaining 1/6 work done by c= 2 days
therefore , C's 1 day work is=1/12

Ratio of their efficiency -A:B:C = 6:4:5
Amount to be paid to B and C is = 4/15*1500 + 5/15*1500=400+500
so daily wages of B n C = 400/15 + 500/12--- Where is the mistake ?:(
[spoiler]

OA B[/spoiler]
Join the discussion
Source: — Problem Solving |

by Anurag@Gurome » Tue Mar 05, 2013 1:45 am
guerrero wrote:A can do a piece of work in 10 days, B in 15 days. They work for 5 days. The rest of work finished by C in 2 days. If they get $1500 for the whole work, the daily wages of B and C are how much ?
The money will be distributed on the basis of how much they have contributed, i.e. what fraction of the work they have done NOT on the basis of their work efficiency, i.e. how much work they could've done.

Hence, their daily wage will be (fraction of work they do in one day)*(total money)

Therefore,
  • Daily wage of B = $(1/15)*(1500) = $100
    Daily wage of C = $([(1 - 5/6)/2]*(1500) = $(1500/12) = $125
Hence, the daily wages of B and C = $(100 + 125) = $225

The correct answer is B.
Anurag Mairal, Ph.D., MBA
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)

Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/
Join the discussion

by GMATGuruNY » Tue Mar 05, 2013 3:42 am
guerrero wrote:A can do a piece of work in 10 days, B in 15 days. They work for 5 days. The rest of work finished by C in 2 days. If they get $1500 for the whole work, the daily wages of B and C are how much ?

a)150
b)225
c)250
d)300
e)450
[spoiler]

OA B[/spoiler]
Let the job = 30 units.

Since A can complete the job in 10 days, A's rate = w/t = 30/10 = 3 units per day.
Since B can complete the job in 15 days, B's rate = w/t = 30/15 = 2 units per day.

Work produced by A in 5 days = r*t = 3*5 = 15 units.
Work produced by B in 5 days = r*t = 2*5 = 10 units.
The remaining work is produced by C:
30-15-10 = 5 units.

Since B produces 10 of the 30 units, B earns 10/30 = 1/3 of the total amount paid:
(1/3)1500 = 500.
Since B works for 5 days, B's daily payrate = 500/5 = $100 per day.

Since C produces 5 of the 30 units, C earns 5/30 = 1/6 of the total amount paid:
(1/6)1500 = 250.
Since C works for 2 days, C's daily payrate = 250/2 = $125 per day.

Sum of the two daily payrates = 100+125 = 225.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by saurav.jha » Mon Mar 11, 2013 6:59 am
Rate of work done by A in one day 10%
Rate of work done by B in one day 6.67%
Percentage work done together in 1 day 16.67%
Total work done by them in 5 days 16.67 * 5= 83.35%
Work left for C 100-83.35= 16.65%
Total percentage work done by A= 50%
Total percentage work done by B = 6.67*5= 33.35 %
Total percentage work done by C = 16.65%
So ratio of wages shall be in the ratio of the total work done by them 3:2:1
Total of B and C shall be 500 and 250
Daily shall be 500/5 + 250/2 = 100+125= 225 answer