Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

The table shows data for the 12 routes of a city's bus system

A table of data you can sort. Decide whether each of three statements is true.
Expert replies
by BTG Expert Team » Sat Oct 31, 2026 10:17 am
The table shows data for the 12 routes of a city's bus system in 2026: each route's service type, its average number of riders per weekday, the percent change in that number from 2025, the percent of its trips that arrived on time, and its operating cost per rider.

The table is in the answer box below this post. Select a column heading there to sort it.

For each of the following statements, select True if the statement is true based on the information in the table. Otherwise, select False.

1. Every route whose weekday riders fell from 2025 to 2026 has an on-time percent below the median on-time percent of the 12 routes.
2. At least half of all weekday riders on Suburban routes ride routes with an on-time percent above 90.
3. The route with the most weekday riders in 2026 also had the most weekday riders in 2025.

The OA is 1. True, 2. False, 3. False

Answers

1Urban8,400+5882.10
2Urban7,900-4812.35
3Urban6,250+12902.60
4Urban5,800-10792.80
5Suburban3,600+20934.40
6Suburban4,150-6854.05
7Suburban2,900+8915.10
8Suburban3,300-2874.70
9Express1,850+25956.30
10Express2,200-15845.90
11Express1,400+4897.20
12Urban8,100-18831.95

Join the discussion
Source: — Table Analysis |

What we see: a Table Analysis question with 3 True or False statements. Each one needs a different skill: a median, a share counted in riders, and working back from a percent change. Sorting the right column does most of the work.

Step 1. Statement 1: find the median, then check the routes that fell.
What we see: "every route whose weekday riders fell" and "below the median on-time percent."
What it means: two jobs. Sort by on time: 79, 81, 83, 84, 85, 87, 88, 89, 90, 91, 93, 95. With 12 values the median is the average of the 6th and 7th: \(\frac{87 + 88}{2} = 87.5\).
What we do and why: sort by change. The routes with a minus sign are 2 (81), 4 (79), 6 (85), 8 (87), 10 (84) and 12 (83). Every one is below 87.5, so the statement holds.
The trap here: taking 87 as the median. Then route 8, at 87, would not be "below," and you would call the statement false.

Step 2. Statement 2: count riders, not routes.
What we see: "at least half of all weekday riders on Suburban routes."
What it means: the Suburban routes are 5 (3,600 riders, 93), 6 (4,150, 85), 7 (2,900, 91) and 8 (3,300, 87). Routes above 90 are 5 and 7, with \(3{,}600 + 2{,}900 = 6{,}500\) riders. All Suburban riders: \(13{,}950\). Half of that is \(6{,}975\).
What we do and why: 6,500 is less than 6,975, so the statement does not hold.
The trap here: counting routes. 2 of the 4 routes are above 90, exactly half, so "at least half" looks true. The statement counts riders, and the two biggest Suburban routes are the ones below 90.

Step 3. Statement 3: rebuild 2025 from the percent change.
What we see: the table gives 2026 riders and the change from 2025, not the 2025 number.
What it means: 2025 riders \(= \frac{\text{2026 riders}}{1 + \text{change}}\). Route 1 has the most riders in 2026 (8,400); in 2025 it had \(\frac{8{,}400}{1.05} = 8{,}000\). Route 12 has 8,100 now after an 18% drop, so in 2025 it had \(\frac{8{,}100}{0.82} \approx 9{,}878\). Route 2 had \(\frac{7{,}900}{0.96} \approx 8{,}229\).
What we do and why: route 12 had the most riders in 2025, not route 1, so the statement does not hold. Only routes that are big now or fell a lot can compete, so after sorting by riders, check the top few and any route with a large drop.

The trap: in statement 3, sorting by 2026 riders and stopping there. A big drop means a big starting number. Also, an 18% drop is 18% of the 2025 number, so adding 18% of 8,100 back (9,558) is the wrong way to rebuild it, even though it happens to give the same ranking here.
Faster way: in statement 3, estimate: a route that lost 18% started at roughly \(8{,}100 \times 1.2 \approx 9{,}700\), far above route 1's 8,000. No exact division is needed.
Takeaway: Before you compute, ask what each statement counts: routes, riders, or last year's riders. Then sort by that column.

Answer: 1. True, 2. False, 3. False
Join the discussion