Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

The Interstate Bridge over the Apache River

Expert replies
by BTGmoderatorDC » Sat Dec 16, 2017 1:39 am
The Interstate Bridge over the Apache River, built in the 1950s, shows a substantial amount of rust: as much as 45% of its surface is coated in rust. Community activists have argued that the bridge presents a hazard: it is likely to collapse in places where it has rusted through. Professors of mechanical engineering at the local university did an extensive analysis of the bridge. These professors and their graduate students determined that 98% of the rust on the bridge exists on the surface only, and actually seals the underlying steel from the corrosive influence of the elements. The results of this academic study suggest that the bridge is safe for continued use.

In the argument given, the two portions in boldface play which of the following roles?

(A) The first is evidence in support of the conclusion; the second is that conclusion.

(B)The first is the main conclusion of the argument; the second provides evidence that calls this conclusion into question.

(C) The first is evidence taken to support one conclusion; the second provides evidence that calls this conclusion into question.

(D) The first is a position that the argument opposes; the second is the conclusion of the argument.

(E) The first is an interpretation of evidence; the second calls that evidence into question.

Can some experts explain the best answer?

OA D
Join the discussion
Source: — Critical Reasoning |