Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

The design department of a cardboard factory has a computer-

Expert replies
by BTGmoderatorDC » Fri Feb 01, 2019 5:58 am
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

The design department of a cardboard factory has a computer-operated machine that makes cuts and prepares fold lines from a standard flat piece of cardboard so that a full-size prototype can be folded and built into three dimensions. Designers constantly use the machine, which is overloaded with pending cut-outs to create, to test their sketches and, as a rule, need to build at least 5 prototypes before having a design authorized for production. To increase the department's efficiency, the factory manager is planning to introduce a rule demanding that the designers build the first three prototypes manually with pens, rulers, and cutter knives.

Which of the following, if true, most strengthens the reason to expect that the factory manager's plan will succeed?

A) The computer-operated prototype builder needs to be manually fed a new piece of cardboard for every prototype that it prepares although with this help it can make 40 times more prototypes than a designer can in the same amount of time.
B) The constant workload placed on the machine leads to an increase in the number of malfunctions it experiences, and repairing it is very expensive.
C) Because the factory only purchased the computer-operated machine one year ago, all the designers know how to convert two-dimensional sketches into accurate three-dimensional prototypes manually.
D) Since the last prototype is the most critical in the process, the authorization of the product depending upon it, building it manually would not be as accurate as allowing the machine to prepare the cut-out.
E) Instead of checking thoroughly for mistakes, the designers are often hasty in sending their sketches to be created by the machine since doing so requires none of the effort entailed in building a prototype by hand.

OA E

Source: Economist Gmat
Join the discussion
Source: — Critical Reasoning |

edited

by deloitte247 » Wed Feb 06, 2019 6:55 pm
The main concern of this argument talked about a computer operated machine used to create, test and build five prototypes of a cardboard design in order for it to be authorized for production.
But to increase efficiency, the manager plans on making new rules to make designers create the first three prototypes using manual instruments.

Option A :- INCORRECT
If true, the computer operated prototype builder won't be over-loaded with pending cut-out to create because it will be fed with a new piece of cardboard manually and also make the work more efficient, but this will ruin the plan of the company manager and therefore won't strengthen the reason for his plan to succeed.

Option B :- INCORRECT
If true that the work overload actually increases the number of malfunctions and the repair is expensive, it backs up the plan of the factory Manager but isn't strong enough to make the plan succeed because the machine can be fixed and put to work again.

Option C :- INCORRECT
This option doesn't help to strengthen the reason for the factory Manager's plan because, If all the designers know how to convert two dimensional stretches into accurate three dimensional prototypes manually, there will be increase in efficiency as well as no need for Manager's plan.

Option D :- INCORRECT
If true that the last prototype is the most crucial in the process and to authorize the prototype depends on it, building it manually cannot make the prototype accurate which won't make it authorized and would definitely lead to inefficiency. This plan totally negates the Manager's plan and doesn't encourage manual making of prototypes.

Option E :- CORRECT
This option depicts that the designers do not thoroughly check for errors and mistakes and are hasty to send their sketches to their machine which causes it to be overloaded and thereby reduces efficiency. This reason strongly backs up the Manager's plan and would succeed based on the need that the designer should be more thorough and efficient in the creation of prototypes as well as to reduce the workload on the computer operated machines.
Join the discussion