BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Ten theater students are to begin work on a set for a musica

Expert replies
by BTGmoderatorDC » Fri Apr 26, 2019 4:31 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12

OA A

Source: Veritas Prep
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Sat Apr 27, 2019 1:58 am
BTGmoderatorDC wrote:Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12
(50 days)/(60 days) = 5/6.
To finish the job in 5/6 of the normal time, the crew requires 6/5 of the normal number of students -- an increase of 1/5:
(1/5)(10) = 2 more students.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Scott@TargetTestPrep » Mon May 06, 2019 7:08 pm
BTGmoderatorDC wrote:Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12

OA A

Source: Veritas Prep
We are given that 10 theater students will finish a set in 60 days. Since rate = work/time, the rate of those students is 1/60 = 1/60. However, since the set needs to be completed in 50 days, we can create the following proportion to determine how many more students are needed, to complete the job in 50 days:

10 students is to a rate of 1/60 as x students is to a rate of 1/50.

10/(1/60) = x/(1/50)

600 = 50x

12 = x

Thus, 2 more students will be needed to complete the set in 50 days.

Answer: A

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion