Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Ten theater students are to begin work on a set for a musica

Expert replies
by BTGmoderatorDC » Fri Apr 26, 2019 4:31 pm
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12

OA A

Source: Veritas Prep
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Sat Apr 27, 2019 1:58 am
BTGmoderatorDC wrote:Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12
(50 days)/(60 days) = 5/6.
To finish the job in 5/6 of the normal time, the crew requires 6/5 of the normal number of students -- an increase of 1/5:
(1/5)(10) = 2 more students.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Scott@TargetTestPrep » Mon May 06, 2019 7:08 pm
BTGmoderatorDC wrote:Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12

OA A

Source: Veritas Prep
We are given that 10 theater students will finish a set in 60 days. Since rate = work/time, the rate of those students is 1/60 = 1/60. However, since the set needs to be completed in 50 days, we can create the following proportion to determine how many more students are needed, to complete the job in 50 days:

10 students is to a rate of 1/60 as x students is to a rate of 1/50.

10/(1/60) = x/(1/50)

600 = 50x

12 = x

Thus, 2 more students will be needed to complete the set in 50 days.

Answer: A