Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

sprockets prblem...

Expert replies
by Ozlemg » Sat Aug 20, 2011 1:58 am
Machince A and B are each used to manufacture 660 sprockets. It takes A 10 hours longer to produce 660 sprockets than machine B. B produces 10 percent more sprockets per hour than A. How many sprockets per hours does machine A produce?
A. 6
B. 6.6
C. 60
D. 100
E 110

OA A

sorry, typo! I editted the OA.
Last edited by Ozlemg on Sat Aug 20, 2011 2:52 am, edited 2 times in total.
The more you suffer before the test, the less you will do so in the test! :)
Join the discussion
Source: — Problem Solving |

by akhilsuhag » Sat Aug 20, 2011 2:26 am
I think the OA should be[spoiler] A(6)[/spoiler]

Total Work: 660


Time: For A :- x+10 ; For B :- x ( Because: A takes 10 hrs longer to produce)
Rate: For A :- y ; For B :- 1.1y ( Because: B produces 10 percent more than A)

Now since the total work is the same for both we can equate:

y(x+10) = 1.1yx --> xy+10y = 1.1xy --> x=100.

Now y(x+10) = 660 --> 110y = 660 --> y=6.

Now Rate of A is 6 and that of B is 6.6 (Wither the question asks rate of B if the OA is B or the OA is incorrect.... IMO).
Ofcourse I am no expert, so can be wrong.
Join the discussion

by knight247 » Sat Aug 20, 2011 2:50 am
The answer is actually A

For Machine A
Work=660
Time=T1
Rate=R1=660/T1


For Machine B
Work=660
Time=T2
Rate=R2=660/T2


Given that It takes A 10 hours longer to produce 660 sprockets than machine B
T1-T2=10
aka

660/R1-660/R2=10......(1)

Also, it is given that B produces 10 percent more sprockets per hour than A. Meaning that B's rate of production/hr is 10% greater than A's rate of production/hr

R2=R1(1+10/100)

R2=1.1R1

Substituting this value in (1)
600/R1-600/1.1R1=10

Solving we get R1=6 and using this value we can find the value of R2 which is 6.6. Hence [spoiler]A[/spoiler]
Join the discussion

by GMATGuruNY » Sat Aug 20, 2011 3:16 am
Ozlemg wrote:Machince A and B are each used to manufacture 660 sprockets. It takes A 10 hours longer to produce 660 sprockets than machine B. B produces 10 percent more sprockets per hour than A. How many sprockets per hours does machine A produce?
A. 6
B. 6.6
C. 60
D. 100
E 110

OA B
We can plug in the answers, which represent the rate for A.

Since the difference between the time for A and the time for B is an integer (10 hours), the correct answer must yield an integer value when divided into 660.
Eliminate D.

B produces 10% more sprockets per hour than A.
Thus, when the correct answer is increased by 10% and divided into 660, the result must be an integer.
Eliminate B, since (1.1)*(6.6) = 7.26, which does not divide evenly into 660.
Eliminate E, since (1.1)*(110) = 121, which does not divide evenly into 660.

The correct answer must be C or A.

Answer choice C: 60 sprockets per hour for A.
Time for A = w/r = 660/60 = 11.
Since B produces 10% more sprockets per hour, rate for B = (1.1)*60 = 66.
Time for B = w/r = 660/66 = 10.
Difference in times = 11-10 = 1.
Eliminate C.

The correct answer is A.

Please note that we had to try only ONE answer choice to determine the correct answer -- a VERY efficient way to solve this problem.

For the skeptical, answer choice A: 6 sprockets per hour for A.

Time for A = w/r = 660/6 = 110.
Since B produces 10% more sprockets per hour, rate for B = (1.1)*6 = 6.6.
Time for B = w/r = 660/6.6 = 100.
Difference in times = 110-100 = 10.
Success!
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by saketk » Sat Aug 20, 2011 9:22 am
Hi -- You can quickly solve this question if you use the answer options.

Logically, you can directly eliminate D and E because the total time should be more that 10 in any case.
Also if you look at B, its in decimal.. not that easy to pick to solve the question.
Choose A, and Hey, this is the right answer. :)
Plugging 6 gives us 110 hrs and for B it gives 100 hrs. Suffice the condition in the stem.
Ozlemg wrote:Machince A and B are each used to manufacture 660 sprockets. It takes A 10 hours longer to produce 660 sprockets than machine B. B produces 10 percent more sprockets per hour than A. How many sprockets per hours does machine A produce?
A. 6
B. 6.6
C. 60
D. 100
E 110

OA A

sorry, typo! I editted the OA.