BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Running at their respective constant rates, machine X takes

Expert replies
by BTGmoderatorLU » Fri Mar 23, 2018 5:48 pm
Running at their respective constant rates, machine X takes 2 longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5/4 w in 3 days, how many days would it take machine X alone to produce 2w widgets?

A. 4
B. 6
C. 8
D. 10
E. 12

The OA is E.

I'm really confused by this PS question. Experts, any suggestion about how to solve it? Thanks in advance.
Join the discussion
Source: — Problem Solving |

by Vincen » Sat Mar 24, 2018 3:46 am
Hello LUANDATO.

Let's say y = number of days taken by Y to do w widgets. Then X will take y+2 days to do w widgets. Since both machines produce 5/4 widgets in 3 days, then they produce $$\frac{\frac{5}{4}}{3}=\frac{5}{12}\ widgets\ per\ day.$$ Now we can set the equation: $$\frac{1}{y+2}+\frac{1}{y}=\frac{5}{12}\ \Rightarrow\ \ 12\left(\ y+y+2\right)=5y\left(y+2\right)\ \Rightarrow\ \ 24y+24=5y^2+10y$$ $$\Rightarrow\ \ 5y^2-14y-24=0\ \Rightarrow\ \ y=\frac{14\pm\sqrt{196+480}}{10}=\frac{14\pm26}{10}$$ $$y_1=\frac{14+26}{10}=\frac{40}{10}=4.$$ $$y_2=\frac{14-26}{10}=-\frac{12}{10}=-\frac{6}{5}< 0,\ \ cannot\ be\ possible.$$ Hence, y=4.

Therefore, X takes 6 days to do w widgets. So, it will take 12 days to doing 2w widgets. The answer is the option E .

I hope it helps.
Join the discussion

by Scott@TargetTestPrep » Fri May 24, 2019 3:07 pm
BTGmoderatorLU wrote:Running at their respective constant rates, machine X takes 2 longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5/4 w in 3 days, how many days would it take machine X alone to produce 2w widgets?

A. 4
B. 6
C. 8
D. 10
E. 12

We can let x = the number of days it takes Machine X to produce w widgets, and thus x - 2 = the number of days it takes Machine Y to produce w widgets. Furthermore, the rate of Machine X is w/x, and the rate of Machine Y is w/(x - 2). We are given that they can produce 5w/4 widgets in 3 days. Thus, we have:

3(w/x) + 3[w/(x - 2)] = 5w/4

Dividing both sides by w, we have:

3/x + 3/(x - 2) = 5/4

Multiplying both sides by 4x(x - 2), we have:

12(x - 2) + 12x = 5x(x - 2)

12(x - 2) + 12x = 5x(x - 2)

12x - 24 + 12x = 5x^2 - 10x

5x^2 - 34x + 24 = 0

(5x - 4)(x - 6) = 0

x = 4/5 or x = 6

However, x can't be 4/5; if it were, y would be negative. Thus, x must be 6. Since it takes Machine X 6 days to produce w widgets, it will take 12 days to produce 2w widgets.

Alternate Solution:

If the two machines working together produce 5w/4 widgets in 3 days, then they would produce w widgets in 3/(5/4) = 12/5 days.

Let y be the number of days for machine Y to produce w widgets. Then, machine X produces w widgets in y + 2 days. In one day, machine Y will produce 1/y of w widgets and machine X will produce 1/(y + 2) of w widgets. We also know that working together it takes them 12/5 days to produce w widgets; therefore in one day, working together, they produce 1/(12/5) = 5/12 of w widgets. Thus, we can form the following equation:

1/y + 1/(y + 2) = 5/12

(2y + 2)/[y(y+2)] = 5/12

24y + 24 = 5y^2 + 10y

5y^2 - 14y - 24 = 0

(5y + 6)(y - 4) = 0

y = -6/5 or y = 4

Since y cannot be negative, y is 4. Thus, it takes machine X 4 + 2 = 6 days to produce w widgets, and therefore, it will take machine X 6 * 2 = 12 days to produce 2w widgets.

Answer: E

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion

BTGmoderatorLU wrote:
Fri Mar 23, 2018 5:48 pm
Running at their respective constant rates, machine X takes 2 longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5/4 w in 3 days, how many days would it take machine X alone to produce 2w widgets?

A. 4
B. 6
C. 8
D. 10
E. 12

The OA is E.

I'm really confused by this PS question. Experts, any suggestion about how to solve it? Thanks in advance.
One approach is to assign a nice value to the job (w)

Let's say that w = 12.

GIVEN: Running at their respective constant rates, machine X takes 2 days longer to produce 12 widgets than machine Y
Let t = time for machine Y to produce 12 widgets
So, t+2 = time for machine X to produce 12 widgets

RATE = output/time

So, machine X's RATE = 12 widgets/(t + 2 days) = 12/(t+2) widgets per day
And machine Y's RATE = 12 widgets/(t days) = 12/t widgets per day

The two machines together produce 5w/4 widgets in 3 days
In other words, The two machines together produce 5(12)/4 widgets in 3 days
Or the two machines together produce 15 widgets in 3 days
This means the COMBINED RATE = 5 widgets per day

So, we can write: 12/(t+2) + 12/t = 5
Multiply both sides by (t+2)(t) to get: 12t + 12t + 24 = 5(t+2)(t)
Simplify: 24t + 24 = 5t² + 10t
Rearrange: 5t² - 14t - 24 = 0
Factor to get: (5t + 6)(t - 4) = 0
So, EITHER t = -6/5 OR t = 4
Since the time cannot be negative, it must be the case that t = 4

If t = 4, then it takes Machine Y 4 days to produce 12 widgets
And it takes Machine X 6 days to produce 12 widgets

How many days would it take machine X alone to produce 2w widgets?
In other words, how many days would it take machine X alone to produce 24 widgets? (since w = 12)

If it takes Machine X 6 days to produce 12 widgets, then it will take Machine X 12 days to produce 24 widgets

Answer: E