BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

rectangular wall

Expert replies
by jainrahul1985 » Tue Dec 06, 2011 9:44 pm
A took a contract to paint a rectangular wall on both sides he did 1/2 of the work with M & remaining 1/2 with help of N & K each of whose efficency is twice that of M . A completed painting other side of wall working alone . If A's share is 75% of the total amount given to all four workers what is the ratio of efficncy of A:M?

1)3:1
2)4:1
3)2:1
4)1:4
5)1:2

OA C
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Tue Dec 06, 2011 10:45 pm
jainrahul1985 wrote:A took a contract to paint a rectangular wall on both sides he did 1/2 of the work with M & remaining 1/2 with help of N & K each of whose efficency is twice that of M . A completed painting other side of wall working alone . If A's share is 75% of the total amount given to all four workers what is the ratio of efficncy of A:M?

1)3:1
2)4:1
3)2:1
4)1:4
5)1:2

OA C
We can plug in the answers, which represent A's rate : M's rate.

Answer choice C: 2:1.
A working with M:
Let A's rate = 2 units per hour and M's rate = 1 unit per hour.
Combined rate for A+M = 3 units per hour.
Since A completes 2 of these 3 units, the fraction of the work produced by A = 2/3.

A working with N and K:
Since N and K are twice as fast as M, N's rate = 2 units per hour and K's rate = 2 units per hour.
Combined rate for A+N+K = 6 units per hour.
Since A completes 2 of these 6 units, the fraction of the work produced by A = 2/6 = 1/3.

Let each side of the wall = 6 units, so that the total job = 12 units.

When A+M complete 3 units of one side, the work produced by A = (2/3)3 = 2 units.
When A+N+K complete the remaining 3 units of one side, the work produced by A = (1/3)3 = 1 unit.
When A completes the other side of the wall, the work produced by A = 6 units.

(Work produced by A)/(total work) = (2+1+6)/12 = 9/12 = 3/4 = 75%.
Success!

The correct answer is C.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Anurag@Gurome » Tue Dec 06, 2011 10:50 pm
jainrahul1985 wrote:A took a contract to paint a rectangular wall on both sides he did 1/2 of the work with M & remaining 1/2 with help of N & K each of whose efficency is twice that of M . A completed painting other side of wall working alone . If A's share is 75% of the total amount given to all four workers what is the ratio of efficncy of A:M?

1)3:1
2)4:1
3)2:1
4)1:4
5)1:2

OA C
Out of 2 sides of a wall, A completed painting other side of wall all alone, which means A completed 50% of the work and A's share is 75% of the total amount given to all four workers. So, 25% of the work is done by the remaining workers.
Let us assume that work efficiency of M = M
Then work efficiency of N and K = 2M
Also let us assume the work efficiency of A = A
Then work done by A and M = (A/4)/(A + M)
Work done by A, N and K = (A/4)/(A + 4M)
So, (A/4)/(A + M) + (A/4)/(A + 4M) = 1/4
A[A + 4M + A + M] = (A + M)(A + 4M)
2A² + 5AM = A² + 4M² + 5AM
A² = 4M²
A = 2M
A:M = [spoiler]2:1[/spoiler]

The correct answer is C.
Anurag Mairal, Ph.D., MBA
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)

Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/
Join the discussion

by batmannavneet » Wed Dec 07, 2011 8:57 am
Anurag@Gurome wrote:
jainrahul1985 wrote:A took a contract to paint a rectangular wall on both sides he did 1/2 of the work with M & remaining 1/2 with help of N & K each of whose efficency is twice that of M . A completed painting other side of wall working alone . If A's share is 75% of the total amount given to all four workers what is the ratio of efficncy of A:M?

1)3:1
2)4:1
3)2:1
4)1:4
5)1:2

OA C
Out of 2 sides of a wall, A completed painting other side of wall all alone, which means A completed 50% of the work and A's share is 75% of the total amount given to all four workers. So, 25% of the work is done by the remaining workers.
Let us assume that work efficiency of M = M
Then work efficiency of N and K = 2M
Also let us assume the work efficiency of A = A
Then work done by A and M = (A/4)/(A + M)
Work done by A, N and K = (A/4)/(A + 4M)
So, (A/4)/(A + M) + (A/4)/(A + 4M) = 1/4
A[A + 4M + A + M] = (A + M)(A + 4M)
2A² + 5AM = A² + 4M² + 5AM
A² = 4M²
A = 2M
A:M = [spoiler]2:1[/spoiler]

The correct answer is C.
Can you please tell me how did you come up with A/4 in the highlighted section ?
Join the discussion

by karthikpandian19 » Wed Dec 07, 2011 5:45 pm
I am also confused with this part?
Can you explain?
batmannavneet wrote:
Anurag@Gurome wrote:
jainrahul1985 wrote:A took a contract to paint a rectangular wall on both sides he did 1/2 of the work with M & remaining 1/2 with help of N & K each of whose efficency is twice that of M . A completed painting other side of wall working alone . If A's share is 75% of the total amount given to all four workers what is the ratio of efficncy of A:M?

1)3:1
2)4:1
3)2:1
4)1:4
5)1:2

OA C
Out of 2 sides of a wall, A completed painting other side of wall all alone, which means A completed 50% of the work and A's share is 75% of the total amount given to all four workers. So, 25% of the work is done by the remaining workers.
Let us assume that work efficiency of M = M
Then work efficiency of N and K = 2M
Also let us assume the work efficiency of A = A
Then work done by A and M = (A/4)/(A + M)
Work done by A, N and K = (A/4)/(A + 4M)
So, (A/4)/(A + M) + (A/4)/(A + 4M) = 1/4
A[A + 4M + A + M] = (A + M)(A + 4M)
2A² + 5AM = A² + 4M² + 5AM
A² = 4M²
A = 2M
A:M = [spoiler]2:1[/spoiler]

The correct answer is C.
Can you please tell me how did you come up with A/4 in the highlighted section ?
Join the discussion

by karthikpandian19 » Wed Dec 07, 2011 5:57 pm
Is there any other method to find the answer other than the trial and error method ?
GMATGuruNY wrote:
jainrahul1985 wrote:A took a contract to paint a rectangular wall on both sides he did 1/2 of the work with M & remaining 1/2 with help of N & K each of whose efficency is twice that of M . A completed painting other side of wall working alone . If A's share is 75% of the total amount given to all four workers what is the ratio of efficncy of A:M?

1)3:1
2)4:1
3)2:1
4)1:4
5)1:2

OA C
We can plug in the answers, which represent A's rate : M's rate.

Answer choice C: 2:1.
A working with M:
Let A's rate = 2 units per hour and M's rate = 1 unit per hour.
Combined rate for A+M = 3 units per hour.
Since A completes 2 of these 3 units, the fraction of the work produced by A = 2/3.

A working with N and K:
Since N and K are twice as fast as M, N's rate = 2 units per hour and K's rate = 2 units per hour.
Combined rate for A+N+K = 6 units per hour.
Since A completes 2 of these 6 units, the fraction of the work produced by A = 2/6 = 1/3.

Let each side of the wall = 6 units, so that the total job = 12 units.

When A+M complete 3 units of one side, the work produced by A = (2/3)3 = 2 units.
When A+N+K complete the remaining 3 units of one side, the work produced by A = (1/3)3 = 1 unit.
When A completes the other side of the wall, the work produced by A = 6 units.

(Work produced by A)/(total work) = (2+1+6)/12 = 9/12 = 3/4 = 75%.
Success!

The correct answer is C.
Join the discussion

by user123321 » Wed Dec 07, 2011 8:31 pm
There are many ways to do this one. But we have another way of doing it using time rather than efficiency.

let A takes y hrs
M takes 2x hrs
N takes x hrs ( x hrs because N's efficiency is twice of M's so he takes half the time)
K takes x hrs

if we assume total work as 1
1/4 th work was done by M & A
=> in 1 hr - 1/2x + 1/y = (y+2x)/2xy work will be done
=> 1 work will take 2xy/(y+2x) hrs
=> 1/4th work will take 1/4 * 2xy/(y+2x) hrs

1/4 th work was done by N,K & A
=> in 1 hr - 1/x + 1/x + 1/y = 2/x + 1/y = (2y+x)/xy
=> 1/4 th work will take 1/4 * xy/(2+x) hrs

But we know A took y/4 hrs on first side since he did 25% of the work on first side
=>(1/4 * 2xy/(y+2x)) + (1/4 * xy/(2+x)) = y/4
=>xy/4 * (2/(x+2y) + 1/(2x+y)) = y/4
=>y(5x+4y) = (x+2y)(2x+y)
=> x=y

we need to find ratio of efficiency of A & M = time taken by M/time taken by A = 2x/y = 2x/x = 2/1

hence C

user123321
Just started my preparation :D
Want to do it right the first time.
Join the discussion

by GMATGuruNY » Thu Dec 08, 2011 12:23 am
karthikpandian19 wrote: A took a contract to paint a rectangular wall on both sides he did 1/2 of the work with M & remaining 1/2 with help of N & K each of whose efficency is twice that of M . A completed painting other side of wall working alone . If A's share is 75% of the total amount given to all four workers what is the ratio of efficiency of A:M?

1)3:1
2)4:1
3)2:1
4)1:4
5)1:2

OA C

Is there any other method to find the answer other than the trial and error method ?
Let each side of the wall = 2 units, for a total job of 4 units.
To produce 75% of the job, A must produce 3 units: 2 units when he paints one side of the wall by himself, 1 unit when he paints with the other workers.

Let M's rate = 1 unit per hour.
Since N and K work twice as fast, N's rate = 2 units per hour and K's rate = 2 units per hour, implying a combined rate of 4 units per hour when they work together.
Let A's rate = A.

A and M together:
A produces A units per hour and M produces 1 unit per hour.
Of the total amount of work produced, the fraction produced by A = A/(A+1).
A, N and K together:
A produces A units per hour and N and K produce 4 units per hour.
Of the total amount of work produced, the fraction produced by A = A/(A+4).

Since A must produce 1 unit when he paints with the other workers, the sum of the fractions above is 1:
A/(A+1) + A/(A+4) = 1.
(A² + 4A + A² + A)/(A² + 5A + 4) = 1
2A² + 5A = A² + 5A + 4
A² = 4
A = 2

Since A=2 and M=1, the ratio of A's rate to M's rate = 2:1.

The correct answer is C.

The approach above combines plugging in with algebra.
Plugging in is very helpful here: it provides an easy way to satisfy the conditions given -- that A completes 75% of the work and that N and K work twice as fast as M -- so that the algebra yields an equation in terms of a single variable.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion