Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Ratio Problem

Expert replies
by yuvarajait » Sun Apr 03, 2011 6:09 pm
It takes the average dryer 80 minutes to dry one full load of Bob's laundry. Bob has
one average dryer, and also decides to try one "Super Jumbo-Iron Dryer-Matic",
which is faster than the average dryer by a ratio of 5 : 4. Bob has three loads of
laundry, and both machines are so precise that he can set them to the minute. How
many minutes does it take for him to dry his three loads? (Assume that no time
passes between loads and that he can use both machines concurrently.Bob is allowed to switch partially-dried loads between dryers)

Could you please help deriving the answer. Thanks!
Join the discussion
Source: — Problem Solving |

by vineeshp » Sun Apr 03, 2011 7:26 pm
Hey.

As per the question. The Average Drier A takes 80 mins and the Super dryer is faster by 5:4. If something is faster by 5:4, it means it takes lesser time in the ratio of 4:5. (Because the load under consideration is the same, faster dryer means lesser time taken)

So the S dryer takes 80 * 4/5 = 64 minutes to finish one load.

Working together the amount of drying completed in one minute = 1/64 + 1/80
(5 + 4) / 320 = 9/320 load.
So one full load is completed in 320/9 minutes.

Time to complete 3 loads will three times : 3 * 320/9
=320/3 minutes. 106 2/3 minutes. ~ 107 minutes.

Ask me if you have any doubts.
Vineesh,
Just telling you what I know and think. I am not the expert. :)
Join the discussion

by manpsingh87 » Sun Apr 03, 2011 8:41 pm
vineeshp wrote:Hey.

As per the question. The Average Drier A takes 80 mins and the Super dryer is faster by 5:4. If something is faster by 5:4, it means it takes lesser time in the ratio of 4:5. (Because the load under consideration is the same, faster dryer means lesser time taken)

So the S dryer takes 80 * 4/5 = 64 minutes to finish one load.

Working together the amount of drying completed in one minute = 1/64 + 1/80
(5 + 4) / 320 = 9/320 load.
So one full load is completed in 320/9 minutes.

Time to complete 3 loads will three times : 3 * 320/9
=320/3 minutes. 106 2/3 minutes. ~ 107 minutes.

Ask me if you have any doubts.
agreed with vineesh...!! same reasoning...!!!
O Excellence... my search for you is on... you can be far.. but not beyond my reach!
Join the discussion

by Geva@EconomistGMAT » Mon Apr 04, 2011 1:13 am
GMAT Vs. Real life :)

If you reduce this problem to GMAT methodology, 107 minutes makes sense. The problem is that assuming a rate of 9/320 means that the two driers are working together, ALL the time - which is not the case. In fact, what happens is this:

Bob will fill two loads: one slow load that will take 80 minutes, and a faster load of 64 minutes.

After 64 minutes pass, the first load is ready, and the faster drier will take the third load. This load will take 64 more minutes to dry, for a total of 128 minutes, and there's nothing you can do to shorten that time: the slow drier will finish after 80 minutes, and will just sit there waiting for the faster drier to finish.
So the answer is 128 minutes (two cycles of the faster drier), unless the problem's logic can be extended to include faster drying times for partial loads: If the machines work faster with a smaller load, then it makes sense for Bob to stop the second cycle of the fast dryer and drop a certain portion of the load in the slow drier, so that both machines are utilized for the entire time. Then we could go into the mathematics to optimize that load distribution between the two driers to minimze overall time - it's not even certain that dividing the loads half an half is the best way to go either.

Obviously, this is not a real GMAT question.
Geva
Senior Instructor
Master GMAT
1-888-780-GMAT
https://www.mastergmat.com
Join the discussion