BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Rates

Expert replies
by artstudent » Wed Jul 20, 2011 9:37 pm
Crew A can build a car in 20 minutes and Crew B can build a car in 25 minutes. If both crews work independently and start at the same time, what is the least amount of time required for the two crews to build 10 complete cars?

I had 111(1/9) minutes. OA is 120. Can someone explain?
Join the discussion
Source: — Problem Solving |

by pemdas » Wed Jul 20, 2011 10:40 pm
Crew A's speed 1/20
Crew B's speed 1/25
10 cars will be built in time T
>>>
1/20 - 1/25 = (5-4)/100 = 1/100 is the difference in speed between the crews A and B
hence 1 more (additional) car can be built by crew A than by crew B within 100 minutes

during first 100 minutes 5 cars can be built by crew A and 4 cars can be built by crew B + (Plus) within the next 20 minutes additional 1 (one car) can be built (completed by crew B. This makes T=100+20 or 120 minutes.

artstudent wrote:Crew A can build a car in 20 minutes and Crew B can build a car in 25 minutes. If both crews work independently and start at the same time, what is the least amount of time required for the two crews to build 10 complete cars?

I had 111(1/9) minutes. OA is 120. Can someone explain?
Success doesn't come overnight!
Join the discussion

by winniethepooh » Wed Jul 20, 2011 10:43 pm
As the work is done independently the combined work cannot be a fraction.

Consider first 100 hours of combined work:
Crew A makes 100/20 = 5 cars and Crew B makes 100/25 = 4 cars
Now 1 car has to be made so to take the least possible time and also prudently the car will be made by Crew A. Hence, additional 20 mins will be taken.
So, total = 100 + 20 mins = 120 mins.
Join the discussion

by amit2k9 » Thu Jul 21, 2011 1:39 am
In 100 mints A makes 5 and B makes 4 cars.
total = 9 cars made in 100 mints.

A takes less time to make 1 car = 20 min
hence 10th car will be made by A in 20 more mints.
total = 100+20 = 120 min
For Understanding Sustainability,Green Businesses and Social Entrepreneurship visit -https://aamthoughts.blocked/
(Featured Best Green Site Worldwide-https://bloggers.com/green/popular/page2)
Join the discussion

by GMATGuruNY » Thu Jul 21, 2011 2:32 am
artstudent wrote:Crew A can build a car in 20 minutes and Crew B can build a car in 25 minutes. If both crews work independently and start at the same time, what is the least amount of time required for the two crews to build 10 complete cars?

I had 111(1/9) minutes. OA is 120. Can someone explain?
We could plug in the answers, which the GMAT would provide.
One answer likely would say 100 minutes.
In 100 minutes, A produces 100/20 = 5 cars and B produces 100/25 = 4 cars.
Total cars produced in 100 minutes = 5+4 = 9 cars.
The faster crew -- A -- will require 20 more minutes to produce the 10th car.
Total time = 100+20 = 120 minutes.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion