BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

rates

Expert replies
by bacali » Mon Dec 01, 2008 3:29 pm
Machine A, operating alone at its constant rate, produces 500 feet of a particular fiber in 2 hours. Machine B, operating alone at its constant rate ,produces 500 feet of the same fiber in 3 hours. Machine C, operating alone at its constant rate. Produces 500 feet of the same fiber in 5 hours. How many hours will it take machines A. B, and C, operating together at their respective constant rates, to produce 1000 feet of the fiber?



A. 60/31 B. 15/7 C. 25/11 D. 10/2 E. 20/3



OA: A
Join the discussion
Source: — Problem Solving |

by dmateer25 » Mon Dec 01, 2008 3:52 pm
Take the inverse of each of these rates and set them equal to (1/t) to find the time it takes working together.

For 500 feet:

1/2 + 1/3 + 1/5 = (1/t)

15/30 + 10/30 + 6/30 = 1/t

31/30 = 1/t
30/31=t

so for 500 ft it takes 30/31. For 1000 ft it would be (30/31)*2=60/31
Join the discussion

by cramya » Mon Dec 01, 2008 8:06 pm
Another way

Rate A = 500/2= 250 (FOR 1 HOUR)
Rate B = 500/3 (FOR 1 HOUR)
Rate C = 500/5 = 100

Add the rates when they work together

rate*time = work
(250+500/3+100)*time = work
(250+500/3+100)*time = 1000

time = 3000/1550 = 60/31

A)
Join the discussion