BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

rates and production of fiber

Expert replies
by LevelOne » Sat Jun 20, 2009 10:36 pm
Machine A, operating alone at its constant rate, produces 500 feet of a particular fiber in 2 hours. Machine B, operating alone at its constant rate, produces 500 feet of the same fiber in 3 hours. Machine C, operating alone at its constant rate, produces 500 feet of the same fiber in 5 hours. How many hours will it take machines A, B, and C, operating together at their respective rates, to produce 1,000 feet of the fiber?

I solved it as below, however the official explanation was quite different than my calculations. Can you make a few suggestions, how you would solve it, pls? Thanks!

rates:
1/2 -> machine A
1/3 -> machine B
1/5 -> machine C

1/2 + 1/3 + 1/5 = 5/6 + 1/5 = 25/30 + 6/30 = 31/30

30/31*2 = 60/31
Join the discussion
Source: — Problem Solving |

by rah_pandey » Sun Jun 21, 2009 3:37 am
The approach should be
in 1 hour how much each machine can produce
500/2,500/3,500/5

therefore working together in one hour they will produce
500/2+500/3+500/5
=500(15+10+6)/30
=(500*31)/30

thus for making 1000 feet time reqd
=1000*30/(500*31)
=60/31

your soln is effective and has no problems if you are sure what you were doing. Explaining it and may understanding it becomes difficult.
2 in your soln can be written as 1000/500

where 500*31/30= amt produced in 1 hour
therefore 1000 feet would be produced in
=(1000*30)/(500*31)=(1000/500)*(30/31)=2*30/31
Join the discussion

by LevelOne » Sun Jun 21, 2009 5:32 am
rah_pandey, thanks for the comparison your solution is the same as in
the official source. i might go by this method for the future problems.
Join the discussion

Re: rates and production of fiber

by Ian Stewart » Sun Jun 21, 2009 11:55 am
LevelOne wrote:Machine A, operating alone at its constant rate, produces 500 feet of a particular fiber in 2 hours. Machine B, operating alone at its constant rate, produces 500 feet of the same fiber in 3 hours. Machine C, operating alone at its constant rate, produces 500 feet of the same fiber in 5 hours. How many hours will it take machines A, B, and C, operating together at their respective rates, to produce 1,000 feet of the fiber?
An alternative to using the formula: Let's call producing 500 feet 'one job'. The question asks how long it takes A, B and C take to do two jobs - that will take twice as long as doing one job. Converting each machine to the same amount of time:

A does 15 jobs in 30 hours
B does 10 jobs in 30 hours
C does 6 jobs in 30 hours
A+B+C do 31 jobs in 30 hours
A+B+C do 1 job in 30/31 hours

So they do 2 jobs in 60/31 hours.
For online GMAT math tutoring, or to buy my higher-level Quant books and problem sets, contact me at ianstewartgmat at gmail.com

ianstewartgmat.com