Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Rate

Expert replies
by moneyman » Sun Nov 23, 2008 9:19 am
Is it C?
You do not have the required permissions to view the files attached to this post.
Maxx
Join the discussion
Source: — Problem Solving |

by ravikirancheni » Sun Dec 07, 2008 4:03 am
One Machine of type R's one hour work is (1/36)
One Machine of type S's one hour work is (1/18)

If X no.of Machines of both type were used ,i.e X no of R machines and X no of S machines ....then

(1/2) = X [(1/36)+(1/18 )]

Gives X = 6

So 6 machines were used.

Wats the OA ???
Join the discussion

by shom » Wed Jan 07, 2009 11:32 pm
Just to restate the question asked:

A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R can complete a job in 36 hours and a machine of type S does the same job in 18 hours. If the company used the same number of each type of machine to do the job in 2 hours, how many machines of type R were used?

A 3
B 4
C 6
D 9
E 12

The answer is C) 6

I'm not quite sure why you have 1/2 on the left side of the equation.

Do you mind explaining your thought process again please? Are there alternative approaches to this problem?

thx
Join the discussion

by nervesofsteel » Thu Jan 08, 2009 12:01 am
Yes should be C

1 hr work of machine A = 1/36
1hr wrk of machine B = 1/18

2 hr work of machine A = 2/36
2 hr work of machine B = 2/18

let x number of machine are used

x*2/36 +x*2/18 = 1

so x= 6
Join the discussion

by vivek.kapoor83 » Thu Jan 08, 2009 12:39 am
im gettin 12 as ans.
OA pls
Join the discussion

by jnellaz » Thu Jan 08, 2009 7:00 am
Another way of looking at this problem is if you plug in a number for the value of work. (In some previous posts, users have used the number of pizzas..etc)

So lets say that the value of work is 36 units. (The trick to using this method is to use a number that will be evenly divisible by both times. In this case 36 units is divisible by both 36 and 18.) Thus the equation would look like this:

For Machine R:

Work = 36 units
Time = 36 hours
Rate = 1 unit per hour

For Machine S:

Work = 36 units
Time = 18 hours
Rate = 2 units per hour


Together they are producing 3 unitss per hours. If the job (36 units) is to be completed in 2 hours, it means that 18 units will need to be produced per hour (36/2 hours).

If 18 units need to be produced per hour, you will need:
18 units/3 units per hour for both machines = 6.

Thus you will need 6 machines of each.
Join the discussion

by vivek.kapoor83 » Thu Jan 08, 2009 8:40 am
Oops...i cal exactly the way in the last post...

just made error in last.

i cal 6 machines in 1 hr.So, 12 in 2 hrs... :P ...
Extra smart ????? Excess of everything is back???/
Join the discussion

by coffee5251 » Fri Feb 06, 2009 1:23 pm
In the question, "How many machines of Type R were used?" do specify "Type R" to throw you off? The problem already says the same number of each type of machine was used so "Type R" and "Type S" should be the same, right? Essentially isn't this question asking "What is x"?