beater wrote:If Samson is filling a bathtub with COLD water, it will take him 6 minutes and 40 seconds, and if he fills it with HOT water, it will take him 8 minutes. If draining the tub takes 13 minutes 20 seconds, how many minutes will it take to fill up the bath tub with both HOT and COLD water running while the plug is out, so the water is constantly draining?
a. 16
b. 12
c. 8.6
d. 5
e. 4.75
I find it easiest to do rates problems by converting every worker to the same amount of time:
Cold fills one tub in 6 2/3 mins
Hot fills one tub in 8 mins
Drain empties one tub in 13 1/3 mins
So, using 40 mins for each worker:
Cold fills 6 tubs in 40 mins
Hot fills 5 tubs in 40 mins
Drain empties 3 tubs in 40 mins
So in 40 mins, all working together, they'd fill 6+5-3 = 8 tubs. To fill one tub, it will take 1/8th as long, so 5 minutes is the answer.
For online GMAT math tutoring, or to buy my higher-level Quant books and problem sets, contact me at ianstewartgmat at gmail.com
ianstewartgmat.com