BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Rate problem

Expert replies
by [email protected] » Fri Jul 04, 2014 8:03 am
Working together, 7 identical pumps can empty a pool in 6 hours. How many hours will it take 4 pumps to empty the same pool?

I was trying to solve this question the following way pls tell me whts wrong:

7 pumps do it in 6 hrs therefore 1 pump will do it in 6/7 hrs and 4 pumps can do it in (6/7)*4hrs
Join the discussion
Source: — Problem Solving |

by GMATinsight » Fri Jul 04, 2014 8:14 am
Working together, 7 identical pumps can empty a pool in 6 hours. How many hours will it take 4 pumps to empty the same pool?
Hi Shibsriz,

The mistake is "Number of Pumps" required and "Time taken by them to empty the tank" are Inversely Proportional which you are taking as directly proportional.

Inversely proportional means that Decrease in Number of Pumps by some factor will require Increase in the number of Hours by same factor

Therefore,
If 7 identical pumps can empty a pool in 6 hours
then 1 Pump can empty a pool in 6x7 = 42 hours


Therefore 4 Pump can empty a pool in 6x7/4 = 42/4 = 10.5 hours
"GMATinsight"Bhoopendra Singh & Sushma Jha
Most Comprehensive and Affordable Video Course 2000+ CONCEPT Videos and Video Solutions
Whatsapp/Mobile: +91-9999687183 l [email protected]
Contact for One-on-One FREE ONLINE DEMO Class Call/e-mail
Most Efficient and affordable One-On-One Private tutoring fee - US$40-50 per hour
Join the discussion

by [email protected] » Fri Jul 04, 2014 8:23 am
yep thanks silly mistake!
Join the discussion

by ceilidh.erickson » Fri Jul 04, 2014 9:25 am
Before solving any word problem, it's a good idea to do a "gut-check" first - ask yourself what sort of answer would be logical. Whenever you're looking at a rate problem, fewer workers will need more time to complete the task. So 4 pumps should always take longer than 7 pumps. If you got an answer that was less than 6 hrs, that was your clue that your setup was wrong!
Ceilidh Erickson
EdM in Mind, Brain, and Education
Harvard Graduate School of Education
Join the discussion

by Brent@GMATPrepNow » Fri Jul 04, 2014 10:00 am
[email protected] wrote:Working together, 7 identical pumps can empty a pool in 6 hours. How many hours will it take 4 pumps to empty the same pool?
For work questions, there are two useful rules:

Rule #1: If a person can complete an entire job in k hours, then in one hour, the person can complete 1/k of the job
Example: If it takes Sue 5 hours to complete a job, then in one hour, she can complete 1/5 of the job. In other words, her work rate is 1/5 of the job per hour

Rule #2: If a person completes a/b of the job in one hour, then it will take b/a hours to complete the entire job
Example: If Sam can complete 1/8 of the job in one hour, then it will take him 8/1 hours to complete the job.
Likewise, if Joe can complete 2/3 of the job in one hour, then it will take him 3/2 hours to complete the job.

Let's use these rules to solve the question. . . .

7 identical pumps can empty a pool in 6 hours.
By Rule #1, we know that IN 1 HOUR, 7 pumps can empty 1/6 of the pool.
From this, we can conclude that IN 1 HOUR, 1 pump can empty 1/42 of the pool.

How many hours will it take 4 pumps to empty the same pool?
If 1 pump can empty 1/42 of the pool IN 1 HOUR, then 4 pumps can empty 4/42 of the pool IN 1 HOUR.
By Rule #2, we can conclude that 4 pumps will empty the ENTIRE pool in 42/4 hours ( = 10.5 hours).

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by [email protected] » Fri Jul 04, 2014 1:52 pm
Hi shibsriz,

These types of rate questions can be solved in a variety of ways (as evidenced by the various responses to your question). Here's another way of dealing with this question....

Since we have 7 machines working for 6 days, there are 7x6 = 42 machine-days of work required to complete the job.

Those 42 machine-days of work can be spread over any number of machines (and by extension, over any number of days).

1 machine would need 42 days to complete the job
2 machines would need 21 days to complete the job
3 machines would need 14 days to complete the job
Etc.

In that same way, to get the job done in....
1 day would require 42 machines
2 days would require 21 machines
3 days would require 14 machines
Etc.

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion