BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Rate/Percent Problem

Expert replies
by bburton11 » Thu May 28, 2009 3:35 pm
Working alone at its constat rate a machine seal K cartons in 8 hours, and working alone at its own constat rate, a second machine seals K cartons in 4 hours. If the two machines , each working at it own contact rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate.

25%

33 1/3%

50%

60 2/3%

75%

answer is 60 2/3%
Join the discussion
Source: — Problem Solving |

by ssmiles08 » Thu May 28, 2009 3:44 pm
you first add the two rates:

rate of Machine1= k/8
rate of Machine2= k/4

k/8 + k/4 = 3k/8

faster rate is machine2: k/4

(k/4)/(3k/8) = 2/3 = 60.6667%
Last edited by ssmiles08 on Thu May 28, 2009 3:49 pm, edited 1 time in total.
Join the discussion

by truplayer256 » Thu May 28, 2009 3:48 pm
Let's call the first machine, Machine A and the second machine, Machine B.

Machine A can seal K cartons in 8 hours, which means that it can seal K/8 cartons per hour. Machine B can seal K cartons in 4 hours, which means that it can seal K/4 cartons per hour. Together, both machines can seal K/8+K/4 or 3K/8 cartons per hour. Let's say that they sealed a total of y cartons working together and that it took them 3K(t)/8=y t=8y/3k hours to do the job. In order to find out how how many cartons were sealed by Machine B (The machine working at the faster rate), all we have to do is multiply 8y/3k hours by K/4(since that's how many cartons Machine B seals in a hour).

K/4*8Y/3K=2Y/3

Now to find the percent of cartons sealed by Machine B, we do (2Y/3)/Y*100 to get 66.67% or 66 2/3%. I think there's an error or a typo in one of the answer choices, it should be 66.67%, not 60.67%.
Join the discussion

Re: Rate/Percent Problem

by sureshbala » Fri May 29, 2009 10:57 pm
bburton11 wrote:Working alone at its constat rate a machine seal K cartons in 8 hours, and working alone at its own constat rate, a second machine seals K cartons in 4 hours. If the two machines , each working at it own contact rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate.

25%

33 1/3%

50%

60 2/3%

75%

answer is 60 2/3%
Folks, this is very simple.

In 8 hrs first machine seals K cartons

In 8 hrs second machine seals 2K cartons.

So if total work is 3K, work done by the faster machine is 2K.

Hence its contribution is 2K/3K = 2/3 = 66.67%

Check your choices once again
Join the discussion