BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

rate and work - confused!

Expert replies
by kunalkulkarni » Mon Feb 11, 2013 1:11 pm
Six Machines,each working at same constant rate ,together can complete the job in 12 days.How many additional machines each working at same constant rate,will be needed to complete job in 8 days?

A 3
B 4
C 5
D 6
E 2

I read the explanation for this problem in one of the posts where it is said:
Machine and days are inversely proportional.
How?
R*T=W
Since, rate is constant, isn't time(days) directly proportional to work?

Please help with the concept and explanation for above.

Thanks in advance,
Kunal
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Mon Feb 11, 2013 1:31 pm
kunalkulkarni wrote:Six Machines,each working at same constant rate ,together can complete the job in 12 days.How many additional machines each working at same constant rate,will be needed to complete job in 8 days?

A 3
B 4
C 5
D 6
E 2
If 6 machines take 12 days to complete the job, then we can say that the job takes 72 "machine days" to complete the job (6x12=72)

To complete the job in 8 days would require 9 machines (72 machine days divided by 8)

So, we need an additional 3 machines.

Answer = A

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by kunalkulkarni » Mon Feb 11, 2013 1:46 pm
Thank you Brent. 'Machine-days' concept similar to 'Man-days' helped me to understand!

Cheers,
Kunal
Join the discussion

by ceilidh.erickson » Mon Feb 11, 2013 1:54 pm
Since, rate is constant, isn't time(days) directly proportional to work?
Yes, the time is directly proportional to the work, for a single machine. The longer that machine works, the more work is produced.

Here, though, we have the added element of multiple machines working. It makes sense that the more machines we have working, the less time it will take them to complete the same amount of work. The number of machines and the time are thus inversely proportional. In effect, the rate isn't constant - the rate for each machine is constant, but we're taking the sum of the rates of all the machines.

As Brent said, the rate of each machine is 1 job in 72 days, or 1/72 job/day. If the time is changed to 8 days, we need to determine how many machines each working at 1/72 job/day can do 1 job in 8 days. We can think of the question like this:
(n machines)(1/72 job/day)(8 days) = 1 job
(n)(1/9) = 1
n must equal 9.
9 - 6 = 3 additional machines.
Ceilidh Erickson
EdM in Mind, Brain, and Education
Harvard Graduate School of Education
Join the discussion

by kunalkulkarni » Mon Feb 11, 2013 4:26 pm
It just can't get better!
What a wonderful elucidation on the concept Ceilidh! I am now convinced these attributes are inversely proportional.

Cheers,
Kunal
Join the discussion

by GMATGuruNY » Mon Feb 11, 2013 6:24 pm
kunalkulkarni wrote:Six Machines,each working at same constant rate ,together can complete the job in 12 days.How many additional machines each working at same constant rate,will be needed to complete job in 8 days?

A 3
B 4
C 5
D 6
E 2
An alternate approach is to plug in a rate for each machine.

Let the rate for each machine = 1 unit per day.
Thus, the rate for 6 machines = 6 units per day.
Work produced in 12 days = r*t = 6*12 = 72 units.
To produce 72 units in 8 days, the required rate = w/t = 72/8 = 9 units per day.
To increase the rate from 6 units per day to 9 units per day, 3 more machines are needed.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by kunalkulkarni » Tue Feb 12, 2013 5:10 pm
Thank you so much GMATGuru!!

Cheers,
Kunal
Join the discussion