BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0563 reviews
Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep
NEWSWEEK READERS’ CHOICE AWARDS 2026

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Quebec Bridge

Expert replies
by durgesh79 » Fri Jun 27, 2008 4:50 am
During the construction of the Quebec Bridge in 1907,
the bridge’s designer, Theodore Cooper, received word
that the suspended span being built out from the
Bridge’s cantilever was deflecting downward by a
fraction of an inch [2.56 centimeters]. Before he could
telegraph to freeze the project, the whole cantilever arm
broke off and plunged, along with seven dozen workers,
into the St. Lawrence River. It was the worst bridge construction
disaster in history. As a direct result of the
inquiry that followed, the engineering “rules of thumb”
by which thousands of bridges had been built around the
world went down with the Quebec Bridge. Twentieth-
century bridge engineers would thereafter depend on far 25
more rigorous applications of mathematical analysis.

Which one of the following statements can be properly
inferred from the passage?

(A) Bridges built before about 1907 were built
without thorough mathematical analysis and,
therefore, were unsafe for the public to use.
(B) Cooper’s absence from the Quebec Bridge
construction site resulted in the breaking off
of the cantilever.
(C) Nineteenth-century bridge engineers relied
on their rules of thumb because analytical
methods were inadequate to solve their
design problems.
(D) Only a more rigorous application of mathematical
analysis to the design of the Quebec
Bridge could have prevented its collapse.
(E) Prior to 1907 the mathematical analysis incorporated
in engineering rules of thumb was
insufficient to completely assure the safety
of bridges under construction.
Join the discussion
Source: — Critical Reasoning |

by niraj_a » Fri Jun 27, 2008 5:07 am
is it E buddy?

D is definitely out and A and C are tricky :)
Join the discussion

by newera » Fri Jun 27, 2008 7:47 am
I agree with niraj, I'm going for E.

A --we can't really claim that the bridges built in the past were without thorough mathematical analysis. thats a bold statement to make.
B --totally out
C --we don't know that
D --maybe, but again, the word "only" is too restrictive and raises a red flag
E --makes the most sense. moderate language.
Join the discussion

by raunekk » Fri Jun 27, 2008 11:26 am
definately E
Join the discussion

by chidcguy » Fri Jun 27, 2008 1:02 pm
A) Bridges built before about 1907 were built
without thorough mathematical analysis and,
therefore, were unsafe for the public to use.

Infers too much


(B) Cooper’s absence from the Quebec Bridge
construction site resulted in the breaking off
of the cantilever.

TC's absence is not the reason.

(C) Nineteenth-century bridge engineers relied
on their rules of thumb because analytical
methods were inadequate to solve their
design problems.


we don't know whether analytical models of 19th century were inadequate or not.

(D) Only a more rigorous application of mathematical
analysis to the design of the Quebec
Bridge could have prevented its collapse.

Scope issue with only. Not good for inference Q's

(E) Prior to 1907 the mathematical analysis incorporated
in engineering rules of thumb was
insufficient to completely assure the safety
of bridges under construction.

makes a lot of sense because 20th century engineering rules added 25 more analysis rules

E is my pick, unless there is a big landmine :)
Please do not post answer along with the Question you post/ask

Let people discuss the Questions with out seeing answers.
Join the discussion

by durgesh79 » Fri Jun 27, 2008 1:31 pm
thanks Guys, OA is E
Join the discussion

by khanshainur » Wed May 11, 2016 12:44 am
I agree with you guys. I also think that the right answer is E
Join the discussion