BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Problem Solving

Expert replies
by bburton11 » Mon May 18, 2009 3:33 pm
Can someone please provide explanations to the problems on the attached file? THanks!

Of note, the answers are in bold.
Attachments
gmat questions.docx
(11.12 KiB) Downloaded 119 times
Join the discussion
Source: — Problem Solving |

by dtweah » Mon May 18, 2009 4:01 pm
1.

Whenever given 2 rates find the difference of the rates. First change rev/min to rev/s
P makes (1/6 )rev/s Q makes ( 2/3) rev/s.
2/3-1/6= ½ (rev/s) So Q is ahead by half rev/s . If Q is to be bhead by 6rev, he will do it in (watch the units) 6rev/1/2(rev/s) =12s.
Join the discussion

by dumb.doofus » Tue May 19, 2009 12:44 am
1. 12 secs ( as described above)

2. 8pi

side of square = 4
Diagonal = 4root(2)
radius = 2root92)
area of circle = 8pi

3. $16

Let x be cost

80 - x = x/4 gives x = 64

Profit = 80 - 64 = 16

4. 2hr 40 min

Files processed by 1st comp in an hour = 60
Files processed by 2nd comp in an hour = 30
Together = 60 + 30 = 90/hr

240/90 = 2 Hr 40 mins..

5. 155

Total hours = 1 + 1300/150 = 9.66

Avg = 1500/9.66 = 155 (approx)
One love, one blood, one life. You got to do what you should.
https://dreambigdreamhigh.blocked/
https://gmattoughies.blocked/
Join the discussion

by bburton11 » Tue May 19, 2009 5:30 am
dumb.doofus wrote:1. 12 secs ( as described above)

2. 8pi

side of square = 4
Diagonal = 4root(2)
radius = 2root92)
area of circle = 8pi

3. $16

Let x be cost

80 - x = x/4 gives x = 64

Profit = 80 - 64 = 16

Can you explain where the 4 comes into the equation? Also how did you get x=64

4. 2hr 40 min

Files processed by 1st comp in an hour = 60
Files processed by 2nd comp in an hour = 30
Together = 60 + 30 = 90/hr

240/90 = 2 Hr 40 mins..

5. 155

Total hours = 1 + 1300/150 = 9.66

Avg = 1500/9.66 = 155 (approx)
Join the discussion