BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Probability & Work question

Expert replies
by ramyaravindran » Sat Jan 16, 2010 3:30 pm
Can you please help with these questions below? Thanks.

1. There are 6 seats in a row and 3 married couples need to be seated in such a way that the couples always sits together. In how many ways can this be done?

2. A can complete a certain task in 4 hours. B can complete the same task in 6 hours and C can complete the same task in 8 hours. If A,B and C work together to complete the task then what percentage of work was done by A?
Join the discussion
Source: — Problem Solving |

by ace_gre » Sat Jan 16, 2010 6:14 pm
Hi, Here is my approach..

1. Let the seats be numbered 1 to 6 and the three couples be represented as ABC.

Consider the available seats for the couples as 1,3 and 5. No. of ways the couples can be seated is 3!. Also each couple can be seated in 2!. So total number of seating arrangements = 3! *2!*2!*2! = 48.

IMO 48

2. A can complete 1 job in 4 hrs
A can complete 1/4 job in 1 hr --------(1)
B can complete 1/6 job in 1hr
C can complete 1/8 job in 1 hr.

Total work done by A,B and C in 1 hr = 1/4 +1/6 + 1/8 = 13/24-----(2)

% of work done by A = (1/4) / (13/24) ~ 46%

IMO 46%

Please post OA. Thanks!
Join the discussion

by ramyaravindran » Sun Jan 17, 2010 12:07 pm
Thanks ace_gre. You have the right answer for both the questions.
Join the discussion