On a certain assembly line, the rejection rate for Monday’s production was 4 per cent, for Tuesday’s 8 per cent, and for the two days combined 7 per cent. What was the ratio of Tuesday’s production to Monday’s production?
A. 3/1
B. 2/1
C. 1/1
D. 1/2
E. 1/3
oa..later
On a certain assembly
This topic has expert replies
Let M and T be production. Thenfigs wrote:On a certain assembly line, the rejection rate for Monday’s production was 4 per cent, for Tuesday’s 8 per cent, and for the two days combined 7 per cent. What was the ratio of Tuesday’s production to Monday’s production?
A. 3/1
B. 2/1
C. 1/1
D. 1/2
E. 1/3
oa..later
96M/100 +92T/100 = 93(M+T)/100
3M=T
T/M =3/1
Choose A.